
26
www.eta.co.at
Cleaning (customer)
Cleaning and maintenance
2.5.7
Establish operational readiness
Mounting the cover on the top
Re-install the cover back on top of the boiler.
Fig. 2-55: Cover
Switch the boiler on via the mains switch and start
ash removal
Switch the boiler back on at the mains switch. Press
the [De-ash]
button for the boiler to start the de-
ashing process. Switch the boiler back on using the on
/ off switch
.
Summary of Contents for ePE-K 100-130 kW
Page 7: ...Cleaning and maintenance Maintenance notes 7...
Page 42: ...www eta co at...
Page 43: ......
Page 44: ...www eta co at www eta co at downloads DOWNLOAD...