background image

www.etsolar.com

Subject to technical modifications without notice.   2016 © ET Solar Group

www.etsolar.com

Subject to technical modifications without notice.   2016 © ET Solar Group

6

7

4.3 Anti-salt module mounting procedure

For photovoltaic systems to be installed near the coastline, we recommend using ET 
SOLAR Anti-salt modules with the following installation action items.

www.etsolar.com

Mainstream Grounding Methods:

Grounding System Installation Steps:

Recommended mounting methods

Grounding bolt

Grounding wire

Fluorocarbon paint

Fluorocarbon paint

Grounding wire ring

Grounding wire

Option 2

Before the installation of each module, clean the frame installation area (35mm by 
100mm surrounding the grounding hole) and keep it dry.
Choose either one of the two options described in the diagrams above to properly 
ground the module.
Spray varnish on the yellow portion of the diagram covering the entire grounding 
area.  We recommend fluorocarbon varnish.

For mounting system with bolts, refer to picture 1 and 2.

 

 

Hexagonal screw

Plain washer

Elastic washer

Insulation gasket

 Picture1    

 Picture 2

1) 

2) 

3) 

Clamping installation

Use four clamps on short frame

snow load 5400Pa/wind load 2400Pa

Permissble position of clamps

Use four clamps on long frame

snow load 2400Pa/wind load 2400Pa

Permissble position of clamps

1/4 L ±50mm

1/4 L ±50mm

1/4 L ±50mm

1/4 L ±50mm

Use four clamps on long frame

snow load 5400Pa/wind load 2400Pa

Permissble position of clamps

1/4 of module lenth

1/4 of module lenth

1/4 of module lenth

1/4 of module lenth

Summary of Contents for ET SOLAR Series

Page 1: ...ER ET SOLAR CHINA Please consult your dealer or the manufacturer concerning the warranty of your modules If you have any further questions your dealer and ET Solar will gladly assist you Tel 86 25 868...

Page 2: ...c systems requires specialized skills and knowledge The installer assumes all risk of injury including risk of electric shock Module installation should be performed only by qualified persons All modu...

Page 3: ...ction box has a breather port which must be mounted facing downward and cannot be exposed to the rain The junction box should be on the higher side of the module when it is mounted in order to orient...

Page 4: ...of the system designer or installer The mounting structure and hardware must be made of durable anti corrosion and UV resistant material 4 1 Mounting with bolts A minimum of four module clamps should...

Page 5: ...area 35mm by 100mm surrounding the grounding hole and keep it dry Choose either one of the two options described in the diagrams above to properly ground the module Spray varnish on the yellow portion...

Page 6: ...rocarbon varnish or other chemicals please follow the instructions strictly personal protective equipment such as goggle mask gloves etc may be needed during the operation No photovoltaic module shoul...

Page 7: ...cal connections between wet soiled or otherwise faulty connectors Faulty connections can result in electrical shocks and arcs Expect for equipment grounding ET Solar recommends the negative pole of PV...

Page 8: ...e they are well connected into the PV system Then check the modules one by one as below Measure the open circuit voltage of a module Cover the module completely with opaque material Disconnect the mod...

Page 9: ...installation operation use or maintenance Improper installation operation use or maintenance means that installation operation use or maintenance does not strictly follow this manual and or the local...

Reviews: