background image

INSTALLATION AND MAINTENANCE INSTRUCTIONS 

MAGDUOCP 

MAGDUO Manual Call Point  

26-1659-01

General Description 

The  MAGDUO  Manual  Call  Point  (MCP)  allows  for  user  activation  of  the  fire  alarm 
system.  Once  operated  the  device  latches  into  the  alarm  position  and  requires 
manually resetting via a special key.  

This device is compatible with the range of MAGDUO Fire Alarm Control Panels and 
comprises  a  2-wire  zone-powered  Manual  Call  Point  (MCP).  This  device  may  be 
installed on the same  zone as the  MAGDUO FlexiPoint  detector/sounder  and other 
associated MAGDUO devices

An optional clear front cover is available if required.

 

Before Installation 

The  MCP  must  be  installed  in  compliance  with  the  control  panel  installation  manual.  The  installation  must  also 
meet  the  requirements  of  any  local  authority.  For  maximum  performance  the  MCP  should  be  installed  in 
compliance with BS5839 Pt1 : 2017.  

Spacing 

It is recommended spacing of call points in accordance with BS5839 Pt1. For more specific information regarding 
MCP spacing, placement and special applications please refer to BS5839 Pt1 : 2017. 

Device Installation 

All wiring must be installed in compliance with the recommendations laid out by BS5839 Pt1 : 2017 as well as any 
special recommendations documented in the control panel installation manual. The cabling used should be of a 2-
core 1.5mm

2

 screened, fire resistant type (e.g. MICC or FP200 equivalent), and is to be wired in the form of a

screened 2-

core radial circuit (with no spurs) from the control panel, terminating at the last (“End of Line”) device.   

Site cables may be terminated into the connectors, as shown overleaf. Care should be taken when terminating 
devices to ensure all cables are correctly sleeved and connections are secure. Improper connections will prevent a 
system from responding properly in the event of a fire. 

The MCP may be flush mounted utilising the optional adaptor plate, combined with any standard single gang flush 
mounting  back  box  (with  a  minimum  internal  depth  of  47mm).  Terminate  your  site  cables  directly  into  a  flying 
terminal block. If using a  metal back box, 

do not

 connect the screen to the back box earth terminal or allow it  to 

come into contact with the metal box. 

Please  remember  that  all  high  voltage  testing  must  be  carried  out  before  connection  of  the  MCP  front  unit 
otherwise damage may be caused. 

Once

 

all testing has been carried out on the cabling and ‘continuity & integrity’ has been proven, 

the MCP front may be fitted.

 

If  surface mounting,  connect  the  MCP  wires  into  the  appropriate  terminals  on  the  back  box  according  to the  wire 
colours.  

https://www.espuk.com/technical_support/

product_manuals/?cat=4

Reviews: