background image

Kongsberg XE

How to Get Started

09 - 2020 | Kongsberg XE

Summary of Contents for Kongsberg XE

Page 1: ...Kongsberg XE How to Get Started 09 2020 Kongsberg XE ...

Page 2: ...s 10 4 3 1 User manual for cutting table 10 4 3 2 User manual for iPC 10 4 3 3 Get the best out of iPC 11 4 4 Installation 11 4 4 1 What is received 11 4 4 2 Unpack Equipment 11 4 5 Table Operation 11 4 5 1 Power On Sequence 11 4 5 2 Reset Safety System 12 4 5 3 Power Off Sequence 13 4 5 4 Continue after Safety Break 13 4 6 Software updates 14 4 7 Maintenance 14 5 Safety Issues 15 5 1 What can the...

Page 3: ...ained herein is subject to change without notice Revisions may be issued from time to time to advise of such changes and or additions No part of this system may be reproduced stored in a data base or retrieval system or published in any form or in any way electronically mechanically by print photoprint microfilm or any other means without prior written permission from Esko Graphics Kongsberg AS Thi...

Page 4: ...1 Kongsberg XE Esko Graphics Kongsberg AS www esko com P O Box 1016 NO 3601 Kongsberg NORWAY Tel 47 32 28 99 00 4 ...

Page 5: ...irst edition of this document 02 05 2016 JHBE Certificates updated 13 11 2018 DHO New certificates and other minor updates 03 06 2020 DHO Safety sections updated Declarations and statements updated 23 09 2020 DHO Section FCC conformity statement removed Safety Regulations updated 5 ...

Page 6: ...o This How to get started manual is a brief introduction to the system you are about to receive It should stay available to operators all time 3 2 System Label A System Label is available from Bottom plate of RWS or Front panel depending upon machine model MPU Cabinet System Label sample 6 ...

Page 7: ...3 Kongsberg XE 3 3 EC Declaration of Conformity 7 ...

Page 8: ...3 Kongsberg XE 3 4 RoHS Compliance Declaration 8 ...

Page 9: ...le incl maintenance Customer PDF Local and US User Manual User manual for iPC Customer PDF Local and US User Manual iPC Get the best out of iPC Customer PDF US User manual iPC Technical Reference Tech support personnel PDF US Technical information for special purpose Test manual Service PDF US How to run Hwtest test programs Technical manual Service PDF US Technical information aimed for service n...

Page 10: ...dated regularly Factory installed PCs have All documentation loaded to C Users Public Documents Esko documentation This folder can also be accessed from the help menu The content is sorted on available languages Please note that some documentation is available in English only Note For XE machines which are using XE Guide not iPC please disregard information about iPC 4 3 1 User manual for cutting ...

Page 11: ...d The delivery is specified in a Packing List following the shipment 4 4 2 Unpack Equipment Esko Authorized Personnel only are allowed to unpack the equipment 4 5 Table Operation For detailed information on how to operate the system be familiar with the User manual and complete the following sequences Get started Basic operation Table setup Tool heads and tools 4 5 1 Power On Sequence Ensure the ta...

Page 12: ...hould be constantly lit Any malfuction of the lamp must be corrected as soon as possible since this is a safety feature 6 Table Zero Sequence Press Start pushbutton to complete the Table Zero Sequence The machine will move to the Selected Reference Point 7 Spindle Warm up milling toolhead only Run Warm up sequence by pressing this button in iPC The spindle warning lamp red should flash shortly and ...

Page 13: ...off the PC use the Operating System shutdown procedure 4 5 4 Continue after Safety Break If the Safety System is activated all movements on the table are stopped and the Warning Lamp starts flashing To continue operation proceed as follows 1 Ensure the table is free from obstructions and ready for operation 2 Reset the Safety System by pressing the Pause pushbutton 3 The Warning Lamp on top of the ...

Page 14: ... manual 4 7 Maintenance Maintenance done by the customer is limited to simple preventive maintenance and cleaning This is described in the User manual as well as in the Maintenance manual Any other maintenance repair replacement of parts etc must be done by Esko authorized personnel only 14 ...

Page 15: ...ons Special attention should be paid upon the following Be careful when handling knife blades Knives are extremely sharp Be careful when handling heavy materials Take care of your own health Be careful not to hit parts of tools and Tool Head The system is equipped with a class II laser pointer Avoid laser beam hit your eyes The Main Power on off switch on the Operator Station is for daily power on...

Page 16: ...rk materials Esko is not liable for use of the system when these guidelines are not followed 5 2 Who are allowed to use the system Note We remind you that only the Esko Staff or persons having received appropriate training are allowed to handle manipulate or do repairs on the system Training will be given to the customer appointed operator s by the Esko Service Engineer as part of the installation...

Reviews: