4-INSTALLATION, TRANSMISSION AND OPERATION 
 

Before installation, check and make sure that all users and persons at the outlet are not in use, do not change the factory 

settings. The factory settings are adjusted according to the desired values in the order specifications and are stated in the 

model. The adjustment devices are sealed if requested in the order specification. 

 

To start the installation; partially open the outlet valve on the line, slowly open the inlet valve on the line gradually, remove 

the protective cover 11 by turning it clockwise by hand, in this case, 22 lightly pull the set-up without manually applying 

excessive force, force and impact, verify that there is a gas flow at the outlet side for a few seconds while pulling it, pull 

the set-up slightly further and then release slowly so that the product will be set up. If installation does not occur, repeat 

the procedure. Once the installation has taken place, replace the protection cover 11 with the cover 22, in which case the 

installation  path  11  will  move  forward  with  the  protection  cover  11,  which  will  not  adversely  affect  the  installation. 

(Installation process figure-6). 

 

If you encounter difficulty in pulling the 22-bolt-up bar during installation and encounter the closure of the bolt-hole, 

opening of the inlet valve at a very small amount, not a full amount, allowing a small amount of gas out of the test nipple 

in the outlet line. You can process transactions after processing nipple test. Replace parts. 

 

After the product has been installed, the gas flow is at the exit, the gas line 22 is in the installed position, the gas can be 

mixed into the atmosphere and the gas leakage can be detected by suitable foam, detector etc. check with the gauges, 

inform the gas users about the gas usage. 

 

Depending on the temperature difference during the set-up process or seasonal transitions, there may be momentary gas 

outflow from the product discharge and this is normal. It is important that the gas output does not continue, and if it 

continues, it may be considered a malfunction 

 

If the installation process does not work, please go with us 

 

After the installation; 

For testing outlet pressure, high pressure shutoff, low pressure shutoff, discharge functions; 

 

First of all, take all necessary precautions to prevent dangerous atmosphere on the side of the evacuation gas that may be 

formed from the regulator before all the following operations and do not work in closed areas 

 

Connect the pressure gauge and pressure source to the appropriate test valve on the outlet line of the regulator with a 

tight  seal.  When  the  gas  consumption  is  present  in  the  regulator  line,  check  the  outlet  pressure  and  check  the 

appropriateness within the tolerances. Close the outlet valve at the outlet of the regulator and wait for a while, and check 

that the outlet pressure is stable and that the value is within tolerance. 

 

Slowly increase the pressure in the pressure source and verify that the product is evacuating at the correct pressure. Slowly 

increase the pressurized high pressure in the pressure source to the safety shut-off setting and check that the shut-off set-

up 22 is closed. Then reinstall the device, then close the inlet valve and reduce the pressure source under the pressure 

outlet, and verify that the product automatically turns itself off. 

 

Disconnect the pressure source, close the test valves, check that there are no external leaks on the line, and replace the 

device by following the rules in this order 

Summary of Contents for ERG-SR

Page 1: ...ly be installed by authorized people This product must be assembled in accordance with current regulations and guidelines ESKA VALVE A Sakarya 1 Organize Sanayi B lgesi Mahallesi 11 Cadde No 6 8 Arifi...

Page 2: ...ions procedures in accordance with the technical standards and rules of the gas organizations take all necessary precautions against the risk of fire take in the inhalation of the gas take the necessa...

Page 3: ...pressure range etc Depending on the factors The final technical information of the product is stated on the product label In no case should the following restrictions be used Area of Use Service stat...

Page 4: ...ct label and that the regulator capacity will not be exceeded during use Sufficient tampon volume should be left at the line outlet after the regulator before assembly For products with outlet pressur...

Page 5: ...with a connection greater than the diameter of the connection on the product s body are to be fitted to the inlet and outlet of the product for assembly the forces and moments which are exceeded by t...

Page 6: ...nd the gas leakage can be detected by suitable foam detector etc check with the gauges inform the gas users about the gas usage Depending on the temperature difference during the set up process or sea...

Page 7: ...igure 6 5 PARAMETERS For various reasons if necessary the product outlet pressure and safety shutdown pressure settings should be made as follows The settings should not be changed by more than 10 and...

Page 8: ...vers that you have removed keep the covers as a group and clean them gently with a clean cloth 22 by pulling the money by hand raising the 17 up part then 22 part then 17 part Remove the 24 way screws...

Page 9: ...14 15 16 18 10 11 5 2 4 25 1 P6 External leakage 16 18 1 P7 High exit pressure except tolerances 8 7 2 1 P8 Low exit pressure except tolerances 16 18 5 6 3 2 1 P9 Evacuation system mistakes 7 8 2 1 P...

Page 10: ...lieves the valve a bit relieves the pressure squeeze out instantaneously and then restore all operations 14 Set up shut off no 2 if the door is closed replace the product and check the result 15 Check...

Page 11: ...11 Figure 2 Figure 4...

Page 12: ...12 Figure 8 10 LABEL INFORMATION Pds Output Setting Pressure Pdso High Pressure Safety Closure Setting Pressure Pdsu Low Pressure Safety Closure Setting Pressure...

Page 13: ...atural Gas LPG 11 STORAGE STORAGE LIFTING LOWERING MOVE LOADING TRANSPORT Do not remove the product from its original box and their sleeves unless the use is started do not change the box and its slee...

Page 14: ...B Uygunluk De erlendirme Y ntemi 2014 68 EU PED Category IV Modul B D Modul B Certificate No Valid Until Modul D Certificate No Valid Until 07 202 9280 Z 0040 18 D 0062 24 01 2028 07 202 9280 Z 0088 1...

Page 15: ...4 84 E mail info eskavalve com Authorized Signature Company Stamp The Vendor s Title Address Telephone Fax E mail Authorized Signature Company Stamp The Product s Type Gas Pressure Regulator Brand ESK...

Page 16: ...ses the right to receive free repair if the product breaks down again within warranty period if the maximum time provided for repair is exceeded if the authorized service station Seller manufacturer o...

Reviews: