4-INSTALLATION, TRANSMISSION AND OPERATION
Before installation, check and make sure that all users and persons at the outlet are not in use, do not change the factory
settings. The factory settings are adjusted according to the desired values in the order specifications and are stated in the
model. The adjustment devices are sealed if requested in the order specification.
To start the installation; partially open the outlet valve on the line, slowly open the inlet valve on the line gradually, remove
the protective cover 11 by turning it clockwise by hand, in this case, 22 lightly pull the set-up without manually applying
excessive force, force and impact, verify that there is a gas flow at the outlet side for a few seconds while pulling it, pull
the set-up slightly further and then release slowly so that the product will be set up. If installation does not occur, repeat
the procedure. Once the installation has taken place, replace the protection cover 11 with the cover 22, in which case the
installation path 11 will move forward with the protection cover 11, which will not adversely affect the installation.
(Installation process figure-6).
If you encounter difficulty in pulling the 22-bolt-up bar during installation and encounter the closure of the bolt-hole,
opening of the inlet valve at a very small amount, not a full amount, allowing a small amount of gas out of the test nipple
in the outlet line. You can process transactions after processing nipple test. Replace parts.
After the product has been installed, the gas flow is at the exit, the gas line 22 is in the installed position, the gas can be
mixed into the atmosphere and the gas leakage can be detected by suitable foam, detector etc. check with the gauges,
inform the gas users about the gas usage.
Depending on the temperature difference during the set-up process or seasonal transitions, there may be momentary gas
outflow from the product discharge and this is normal. It is important that the gas output does not continue, and if it
continues, it may be considered a malfunction
If the installation process does not work, please go with us
After the installation;
For testing outlet pressure, high pressure shutoff, low pressure shutoff, discharge functions;
First of all, take all necessary precautions to prevent dangerous atmosphere on the side of the evacuation gas that may be
formed from the regulator before all the following operations and do not work in closed areas
Connect the pressure gauge and pressure source to the appropriate test valve on the outlet line of the regulator with a
tight seal. When the gas consumption is present in the regulator line, check the outlet pressure and check the
appropriateness within the tolerances. Close the outlet valve at the outlet of the regulator and wait for a while, and check
that the outlet pressure is stable and that the value is within tolerance.
Slowly increase the pressure in the pressure source and verify that the product is evacuating at the correct pressure. Slowly
increase the pressurized high pressure in the pressure source to the safety shut-off setting and check that the shut-off set-
up 22 is closed. Then reinstall the device, then close the inlet valve and reduce the pressure source under the pressure
outlet, and verify that the product automatically turns itself off.
Disconnect the pressure source, close the test valves, check that there are no external leaks on the line, and replace the
device by following the rules in this order