STEP 3:
DO NOT TIGHTEN ANY ALLEN HEAD BOLTS H1 UNTIL
COMPLETION OF FRAME ASSEMBLY IN STEP 4.
NOTE CORRECT ORIENTATION OF ALL PARTS AS
SHOWN IN
FIGURE 3
FOR CORRECT ASSEMBLY.
Assemble
P7L
,
P9L
and
P11L
as shown in
FIGURE 3
. Attach this assembly onto
P5
and
P6
as shown in
FIGURE 1
.
Assemble
P8R
,
P10R
and
P12R
as shown in
FIGURE 3
. Attach this assembly onto
P5
and
P6
as shown in
FIGURE 1
.
Install, but
do not tighten
Allen Head Bolts
H1
as shown in
FIGURE 3
.
8 pcs -
H1
Allen Head Bolt
8 pcs -
H2
Flat Washer
8 pcs -
H3
Lock Washer
1 pc -
P7L
Black
Left Back Top Corner
1 pc -
P8R
Black
Right Back Top Corner
1 pc -
P9L
Black
Left Top Side Connecting Tube
1 pc -
P10R
Black
Right Top Side Connecting Tube
1 pc -
P11L
Orange
Left Front Top Corner
1 pc -
P12R
Orange
Right Front Top Corner
1 pc -
T1
Allen Wrench
1 pc - Rubber Mallet
PARTS REQUIRED:
- 7 -
FIGURE 3
THIS STEP REQUIRES TWO OR MORE ADULTS
TO KEEP THE PARTIAL ASSEMBLIES FROM
TIPPING OVER.
CAUTION:
P7L
P11L
P9L
NOTE:
Goalrilla logo
face outside.
P5
P6
NOTE:
Shortest
tube in
this location.
NOTE:
Shortest tube
in this location.
P5
P6
NOTE:
Shortest tube
in this location.
P12R
P8R
P10R
NOTE:
Goalrilla logo
face outside.
H1
H2
H3
H1
H2
H3
H1
H2 H3
H1
H2
H3
H1
H2 H3
H1
H2
H3