![ESAB ST-16 Instructions Manual Download Page 11](http://html.mh-extra.com/html/esab/st-16/st-16_instructions-manual_2425168011.webp)
11
place. Push lever down and listen for distinct click-
ing noise of switch (energized position). Lever should
return upward on its own spring power and another
click will be heard (deenergized position). If the two
clicking noises are heard, the lever switch assembly
is correctly assembled.
Reassemble or replace insulating strip (996340)
which fits into a recess on the I.D. of the body and
over the switch
6.
To reassemble lever switch assembly to torch:
Place the two halves of the torch switch body around
the torch handle and tighten the two No. 8-32 screws.
1.
Locate lever switch assembly at any desired posi-
tion and tighten down the two No. 8-32 x 1/4-in. pan
head screws.
2.
cord of the lever switch assembly in place. Opera-
tor may wish to use 3 or 4 wraps of polyethylene
tape (9025-0033) for added support.
If plastic tape wrappings were cut, wrap 3 or 4 turns
of plastic tape around all service lines spaced ap-
proximately 4-ft. apart.
4.
If removed, place rubber band, that was hanging
loosely over the service line back over the rear of
the torch handle as illustrated in Fig. 3 to hold the
3.