-- 21 --
dia3d1ea
4.3
Testing
S
Connect the welding power source to the mains.
S
Before switching on the welding power source, check that the power supply to
the board is 19 V.
S
Connect the PEH control box to the 12--pole contact (XS4) in the welding power
source by way of the control cable.
S
Switch on the power supply for the welding power source using the rotary switch
(QF) on the front panel.
S
Make sure the power supply is interrupted when the emergency stop (QS) is
activated.
S
Set the welding parameters over the PEH box.
S
Start welding by pressing the START key.
S
Make sure the relay in the welding power source is activated when the welding
starts.
S
Check that different current and voltage values can be set over the PEH box.
S
Mount the protective shields after finished work.
GB
Summary of Contents for LAE 800
Page 26: ...Schema Diagram 26 dia3e11a ...
Page 27: ... 27 dia3e11a ...
Page 28: ... 28 dia3e11a ...
Page 29: ...Reservdelsförteckning Spare parts list 29 dia3r11sa Edition 980216 ...
Page 31: ... 31 dia3r11sa ...