![ESAB ESP-50 Instruction Manual Download Page 40](http://html1.mh-extra.com/html/esab/esp-50/esp-50_instruction-manual_2425001040.webp)
40
6.4
SEQuENCE of oPEraTIoN
NoTES:
1.
When the start signal is turned "on" during postflow period, the postflow and preflow times are canceled.
.
When the amber fault light comes on, cutting operation should be stopped. The postflow time starts from the moment
the start signal is removed.
10 SEC
.5 SEC.
START SIGNAL
GAS SOLENOID VALVE
OPEN
CLOSE
PREFLOW
OFF
ON
FAULT OVERLOAD LIGHT
INVERTER
CUTTING ARC (CURRENT)
POSTFLOW
SECTIoN 6
TrouBlESHooTINg
NOTE:
Schematics and Wiring Diagrams on 11” x 17”
paper are included
inside the back cover of this manual.
Summary of Contents for ESP-50
Page 4: ...TABLE OF CONTENTS...
Page 32: ...32 section 4 operation...
Page 53: ...53 section 7 replacement parts...
Page 54: ...54 notes...
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......