
4 INSTALLATION
0445 030 101
- 10 -
© ESAB AB 2017
4.2
Installing welding equipment
NOTE!
Take care so that the interface cable does not get squeezed between the power
source and the cooling unit!
NOTE!
Power supply of the cooling unit is done from the welding power source via the
CAN cable (see the "OPERATION" chapter).
4.3
Torch installation
1.
Fill with coolant into the cooling unit water tank.
2.
Connect the TIG welding torch. Make sure the torch is
located at the same height as the cooling unit, so that the
coolant will spread quickly throughout the system.
3.
Turn on the mains power supply to the welding power
source.
4.
Select TIG welding on the power source.
5.
Press the welding torch trigger switch.
6.
Let the cooling unit water pump run for three minutes.
7.
Check that the coolant level is between the upper and
lower markings on the water tank. Fill up if needed.
Summary of Contents for EC 1000
Page 1: ...Instruction manual 0445 030 101 GB 20171016 Valid for serial no 720 xxx xxxx EC 1000...
Page 2: ......
Page 20: ...DIAGRAM 0445 030 101 20 ESAB AB 2017 DIAGRAM...
Page 21: ...PUMP CHARACTERISTIC 0445 030 101 21 ESAB AB 2017 PUMP CHARACTERISTIC...
Page 22: ...COOLING CHARACTERISTIC 0445 030 101 22 ESAB AB 2017 COOLING CHARACTERISTIC...