Install RBS
Ge7104A
If applicable, insert the SFP module in the port marked WAN B.
For more information about handling SFP modules, refer to
SFP Modules and Optical Cables
and
.
4. Install Mounting Bracket and Prepare Cables
Protect the RBS and cables from dust by keeping them in the box
when drilling.
Ge7009A
DRILLING TEMPLA
TE / QUICK GUIDE
Put the drilling template on the wall and ensure that it is straight by
using a spirit level. Make sure that the entire drilling template fits on
the wall without it folding around any corners. Use the double-sided
tape at the corners of the template to attach it to the wall.
Ge7010A
If applicable, drill the three holes marked on the drilling template.
Ge7011A
Attach the two upper screws in positions to hang the mounting
bracket.
7
56/1531-LZA 701 6001 Uen D
|
2015-11-06
Summary of Contents for RBS 6402
Page 1: ...Install RBS RBS 6402 INSTALLATION 56 1531 LZA 701 6001 Uen D...
Page 4: ...Install RBS 56 1531 LZA 701 6001 Uen D 2015 11 06...
Page 8: ...Install RBS 4 56 1531 LZA 701 6001 Uen D 2015 11 06...
Page 18: ...Install RBS 14 56 1531 LZA 701 6001 Uen D 2015 11 06...
Page 22: ...Install RBS 18 56 1531 LZA 701 6001 Uen D 2015 11 06...
Page 24: ...Install RBS 20 56 1531 LZA 701 6001 Uen D 2015 11 06...