Installing a MINI-LINK 6351
Caution!
Install the earthing kit only where the cable runs straight.
A
C
B
8
744
Figure 15
An Assembled Earthing Kit
Description
A
Earthing kit body
B
PoE cable
C
Earthing cable
Note:
The temperature of the butyl sealing compound must not be below
–20
C (–4
F) during installation.
Grounding Procedure
Caution!
Make sure to strip the PoE cable at the specified dimension and center the
earthing kit over the stripped part due to risk for leakage.
1.
Strip 20 ± 2 mm (3/4 ± 1/16") of the PoE cable at the desired grounding
point. Use an appropriate tool, for example, a cable jacket cutter.
36
13/1531-HRA 901 17/9 Uen B
|
2016-03-04
Summary of Contents for MINI-LINK 6351
Page 1: ...Installing a MINI LINK 6351 INSTALLATION INSTRUCTIONS 13 1531 HRA 901 17 9 Uen B...
Page 4: ...Installing a MINI LINK 6351 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 8: ...Installing a MINI LINK 6351 4 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 16: ...Installing a MINI LINK 6351 12 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 20: ...Installing a MINI LINK 6351 2 16 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 25: ...Installing the MINI LINK 6351 1 2 21 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 29: ...Installing the MINI LINK 6351 1 2 25 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 46: ...Installing a MINI LINK 6351 42 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 49: ...Aligning the Antenna C E D A B 45 13 1531 HRA 901 17 9 Uen B 2016 03 04...
Page 60: ...Installing a MINI LINK 6351 56 13 1531 HRA 901 17 9 Uen B 2016 03 04...