Verifying the Installation 

 
 

1/1531-HSD 101 41 Uen A   2004-01-30

 13

 

This method is similar to activating real subscribers. In order to use this 
method the following preconditions have to be fulfilled: 

• 

The PEM installation has succeeded 

• 

The PEM configuration of the network has been done 

• 

The servers in the network are running 

• 

All registration has been transferred to the PEM  

The Service Configuration Manager is used for this task. 
Alternatively the Bulk Configuration Manager can be used instead of the 
Service Configuration Manager and may simplify the task of configuring an 
end-user with a service for each line; please see the 

Bulk Configuration 

User’s Guide

 for further details.  

Please refer to 

Local Craft Tool User’s Guide

 and the 

PEM User’s Guide

 for 

detailed information of how to use them. 

Table 3 

Verification with the ECN320 Local Craft Tool 

Verification Activity 

Comments 

Perform continuity check on each line from 
the Exchange MDF to the Line MDF  

Best to perform after rewiring and 

before installing nodes 

Verify that the green LED is lit on the IP 
DSLAMs 

Green – The IP DSLAM has booted 
and received an IP address and SW 

Verify (if possible) that the ECN320 switch 
port where the IP DSLAMs are connected, 
indicates active Ethernet connection 

Active Ethernet connection is 
verified 

Recommended to perform check on each 
ADSL line 

Testing the IP DSLAM functionality 

Recommended to perform continuity check 
on each POTS or ISDN line 

Test that the new installation has 
not affected the old services 

Start the Status Manager and use the Flash 
LEDs button to verify the MDF position of the 
IP DSLAMs (verification of the registration) 

Test of the registration process 

 

 

 

Summary of Contents for EDN312

Page 1: ...EDN312 Installation Guide Ethernet DSL Access IP DSLAM...

Page 2: ...t owner The contents of this document are subject to revision without notice due to continued progress in methodology design and manufacturing Ericsson shall have no liability for any error or damage...

Page 3: ...Cabling 4 3 1 Cabling of Subscriber Lines 4 3 1 1 Cabling Lines 4 3 1 2 Wiring EDGE Connectors 5 3 2 Cabling of Ethernet Connections 8 4 Mounting the IP DSLAM 9 5 Verifying the Installation 10 5 1 Ver...

Page 4: ......

Page 5: ...should have a basic understanding of the Internet Protocol IP The guide can be read separately but for a full understanding of the EDA system the reader is referred to the System Overview The guide c...

Page 6: ...n The operation class 3 2 means tested for partly temperature controlled location Caution The temperature within a rack assembly may be higher than the ambient room temperature Check that the rack env...

Page 7: ...1531 HSD 101 41 Uen A 2004 01 30 3 The distance between the IP DSLAMs must be at least 20 mm so that an IP DSLAM can be dismounted without interfering with the adjacent IP DSLAMs Figure 1 Space Requir...

Page 8: ...ions between the Line MDF and Exchange MDF through the EDGE connectors Figure 2 on page 4 shows the subscriber line connections through the EDGE connectors both for exchange and line side Exchange EDG...

Page 9: ...acket tool and an LSA inserter tool Figure 3 on page 5 shows how to mount the wiring bracket tool on the rods in a subrack Figure 3 Mounting the Wiring Bracket Tool The EDGE connectors must be mounted...

Page 10: ...g the EDGE Connectors Strip approximately 20 cm off the new cable and tie it up with a cable tie to the existing cable as illustrated in Figure 5 on page 7 Alternatively make a loop around the cable g...

Page 11: ...acing the Insertion tool above the slit place the cutting end towards the connector s center and firmly press towards the connector Repeat this step for all wires Figure 6 Cutting and Connection a Wir...

Page 12: ...must not exceed 8 5 one cable one way when the ECN310 switch and or the ECN320 switch is used When EPN124 power nodes are used the resistance must not exceed 10 and ECN320 one cable one way The length...

Page 13: ...through the EDGE connector have been pulled The EDGE connector is removed from the bracket tool and inserted in the rear of the IP DSLAM The IP DSLAM has been labelled with line on one side and exchan...

Page 14: ...r any management system 2 Verification using the Local Craft Tool LCT 3 Verification using PEM 5 1 Verification without Connection to PEM It is not possible to activate the IP DSLAM by this method It...

Page 15: ...received an IP address and SW Verify if possible that the ECN320 switch port where the IP DSLAMs are connected indicates active Ethernet connection Active Ethernet connection is verified Recommended...

Page 16: ...restarted from the CLI LCT ECN320 Step 1 Copy default cfg files to LCT Step 2 Copy new cfg files to ECN320 Step 5 Copy default cfg files back to ECN320 cfg_1 cfg_2 cfg_24 cfg_1 cfg_2 cfg_24 cfg_1 cfg_...

Page 17: ...PEM User s Guide for detailed information of how to use them Table 3 Verification with the ECN320 Local Craft Tool Verification Activity Comments Perform continuity check on each line from the Exchan...

Page 18: ...1553 AOM 901 018 3 Ericsson AB 2004 EDN312 User s Guide 1 1553 HSD 101 41 Ericsson AB 2004 Subrack Installation Guide 1 1531 HSC 901 026 4 Ericsson AB 2004 Outdoor Cabinet Installation Guide 1531 1 BF...

Page 19: ......

Page 20: ...Ericsson AB Ericsson AB 2004 All Rights Reserved www ericsson com 1 1531 HSD 101 41 Uen A 2004 01 30...

Reviews: