Ergonomic products C1A1 Installation And Operation Manual Download Page 6

950-084 C1A1 manual E

ergonomic products • 198 Airport Rd • Fall River, MA 02720 • 866-374-6487

PAGE 6

30” Resupply Cabinet 

with Pulldown

Model C1A1

1. Position the bottom of the Resupply Cabinet 54” above the finished floor where indicated on the elevation. 

This height is required for proper use of the pull-down fixture. 

2. Make sure unit is level. 

3. Using six #10x2-½” screws, secure the Resupply Cabinet into the cabinet blocking through the cleats of the 

cabinet as shown in Fig. 3.1. Use three screws along the top and three along the bottom.

4 – INSTALLATION

Fig. 3.1

6 SCREWS AS REQ'D

Summary of Contents for C1A1

Page 1: ...Product ID C1A1 Manual E C1A1 30 Resupply Cabinet with Pulldown INSTALLATION AND OPERATIONS MANUAL...

Page 2: ...e product in the industry We stand behind our equipment and genuinely believe it to be the best available on the market Should you have any questions regarding the product s installation or use please...

Page 3: ...ing procedures to free the product from the container and remove all packing material and accessory boxes from shipping container 3 Lay individual components on clean surface to avoid scratching and i...

Page 4: ...ith doors available Note this will eliminate the open partitioned under storage OPTIONAL FEATURES Tilt Bins Choose between 5 6 or 9 slot tilt bins Cabinet doors This option is inteneded to be used in...

Page 5: ...7 PAGE 5 30 Resupply Cabinet with Pulldown Model C1A1 3 FRAMING During the framing process a 2 x 6 or equivalent cabinet blocking should be installed at 54 above the finished floor and again at 90 3 4...

Page 6: ...et 54 above the finished floor where indicated on the elevation This height is required for proper use of the pull down fixture 2 Make sure unit is level 3 Using six 10x2 screws secure the Resupply Ca...

Page 7: ...h Pulldown Model C1A1 4 INSTALLATION cont d 1 Remove tilt bins from frame 2 Using supplied screws four 4 6 x 5 8 philips head screw attach tilt bin frame to the bottom of cabinet into the pre drilled...

Page 8: ...inet without them 1 Position the bottom of the Resupply Cabinet 54 above the finished floor centering the cabinet horizontally over two 2 studs This may not allow for proper spacing 2 Make sure the un...

Reviews: