6
SAFETY PRECAUTIONS
•
High operating temperatures of sealant and machine require protective clothing, hard
soled shoes and heat resistant gloves be worn by operator.
•
Always wear eye protection.
•
Observe all
CAUTION AND WARNING
signs posted on machine.
•
Avoid the entrance of water into any part of the machine.
•
Avoid bodily contact with hot sealant material, serious burns may result.
•
Read Operator Manual thoroughly before operating machine.
•
Make sure operator is familiar with machine operation.
•
Do not operate in closed building or confined areas.
•
Shut-down burner and engine prior to refilling propane tank.
•
When adding solid material to sealant tank, stop mixer, lift lid, place material onto lid and
close lid before restarting mixer. Hot material could splash and cause serious burns if this
procedure is not followed.
•
Keep hands, feet, and clothing away from all moving parts.
•
Always keep a fire extinguisher near the unit. Maintain extinguisher properly and be
familiar with its use.
•
Follow operating instructions for starting and shut-down of burner. Instructions are
mounted on control box.
•
Calibrate temperature control prior to initial operation and each 50 hours of operation.
See page 16 step by step instruction.
•
Replace any hoses which show signs of wear, fraying, or splitting. Be sure all fittings and
joints are tight and leak-proof.
•
Precaution is the best insurance against accidents.
•
The BAX 250 Melter should not be left unattended with burner lit.
•
Tighten all bolts and screws after every 100 hours of operation.
•
Crafco, Inc. assumes no liability for an accident or injury incurred through improper use of
the machine.
Summary of Contents for Crafco BAX 250
Page 1: ...BAX 250 PART MANUAL 26357 Rev B...
Page 2: ...2 Created 12 11...
Page 3: ...3 BAX 250 PART NUMBER 55400...
Page 23: ...23 BURNER SCHEMATIC...
Page 24: ...24 BAX 250 ASSEMBLY 1 2 3 4 5 9 6 7 8 10 11 12 13 14 15 16 17 18...
Page 26: ...26 BAX 250 ASSEMBLY 19 22 23 20 20 21 21...
Page 28: ...28 PUMP AGITATOR MOTOR ASSEMBLY...
Page 30: ...30 POWER PACK ASSEMBLY 1 2 3 4 5 6 7 8 9 11 12 13 14 15 16...
Page 32: ...32 CONTROL BOX ASSEMBLY...
Page 34: ...34 GAS MANIFOLD ASSEMBLY...
Page 36: ...36 HYDRAULIC VALVE ASSEMBLY...
Page 40: ...40 LPG PIPING DIAGRAM IN OUT IN OUT 1 2 3...
Page 42: ...ELECTRICAL SCHEMATIC 42...