background image

Preventive Maintenance 

Swiss Egro 50 Serie

 

 

 

 

 

Egro Coffee Systems AG 
CH-5443 Niederrohrdorf 

15.05.09 

Page 10

 

 

Series 50P 

 

 

 

Service kit 

Extension kit 

 

 

ID 

060947 

ID 

060949 

ID 

060951 

ID 

060948 

ID 

060950 

ID 

060952 

Description Assembley 

group 

5012P 

5023P 

5025P 

5012P 

5023P  5025P 

 

 

 

 

 

 

 

 

2 way plunger T30 

Tea valve 

 

 

 

2 way plunger Steam T30 

Steam valve block 

 

 

 

3 way plunger Steam T30 

Steam valve block 

 

 

 

 

3 way plunger T30 

Brewing valve 

 

 

 

Copper gasket  

Relief valve 

 

 

 

Expansion valve 

Coffee boiler 

 

 

 

Gasket kit brewing unit 

Brewing unit 

 

 

 

Level sensor 140 mm  

Steam boiler 

 

 

 

Milk foamer 

Milk system 

 

 

 

 

Non return valve  

Boiler 

 

 

 

O Ring seal  

Steam valve block 

 

 

 

O-Ring seal  

Brewing valve 

 

 

 

O-Ring seal Vacuum valve 

Vacuum valve 

 

 

 

Pressure switch 1.5 bar 

Steam valve block 

 

 

 

Relief valve, steam 

Steam valve block 

 

 

 

Silicon hose 6,0 x 3,0 mm, 
rosa 

Milk system 

 

 

 

 

Silicon hose 6,0 x 3,0 mm, 
white 

Air foam valve 

 

 

 

 

Silicon hose 7,0 x 3,0 mm 

white 

Milk system KS 

 

 

 

 

 

Silicon hose 7,0 x 4,0 mm 
blue  

Milk system 

 

 

 

 

 

Steam boiler gasket 

Steam boiler 

 

 

 

T Hose connector 12-6-12 

Drain system 

 

 

 

T Hose connector 6-6-6 

Drain system 

 

 

 

 

Teflon pipe 4,0 x 2,5 mm 

Milk system KS 

 

 

 

 

 

Threaded male nipple  

6 x G1/8 

Steam valve block 

 

 

 

 

Summary of Contents for 50 Series

Page 1: ...Preventive Maintenance Swiss Egro 50 Series V 2 2 ...

Page 2: ... 50 Serie Egro Coffee Systems AG CH 5443 Niederrohrdorf 15 05 09 Page 2 Index 1 Preventive Maintenance 3 2 Programming manual 3 3 Service table 5 4 Maintenance table 6 5 Lubricant table 8 6 PM Service kits 8 7 PM service kits content 9 ...

Page 3: ...er of cycles the coffee machine is indicating following message in the display PM Service Req Egro Coffee System AG recommends adjusting the maximum brewing cycles for preventive maintenance to 15 000 cycles For coffee machines with the brewing unit NBUP New Brewing Unit Project the number of cycles will be with 25 000 The brewing cycles depend on various criteria as regularity of brewing composit...

Page 4: ...the service organization The number of brewing cycles has to be adapted depending upon application and environment of the coffee machine Reset the brewing cycles After preventive maintenance was accomplished the cycle counter will be reset to zero and activated again Choose menu Service Press enter Choose Max Cycles Press enter Enter the value 15 for 15 000 cycles Pin Enter Pin 1849 Display shows ...

Page 5: ...0 000 cycles or after 2 years 45 000 cycles or after 3 years 60 000 cycles or after 4 years 75 000 cycles or after 5 years 90 000 cycles or after 6 years PM service kit PM service kit PM service kit PM extension kit PM service kit PM service kit PM service kit PM extension kit With brewing unit NBUP 25 000 cycles or after 1 year 50 000 cycles or after 2 years 75 000 cycles or after 3 years 100 000...

Page 6: ...ton Brewing sieve O Ring for piston Turcon gasket Piston motor sensors Ejector Lower piston motor Spindel 1 Brewing piston Brewing sieve O Rings for brewing piston 3 Turcon gasket NBUP Piston motor sensors Boiler coffee tea Boiler Expansion valve Brewing valve Brewing valve plunger O Ring for brewing valve housing 2 O Ring for the connection brewing valve boiler 2 Tea valve Tea valve plunger O Rin...

Page 7: ...nd connections Milk system Milk frother Silikon tubes Teflon tubes Refrigerator Milk sensor Milk pumps Air foam valve Air pump Switch valve Non return valve PM extension kit Every third PM The following maintenance actions have to be done additionally Steam valve block Plunger for steam valve O Ring for steam valve block Pressure switch Gasket for pressure relief valve Pressure relief valve Thread...

Page 8: ...gs tea and steam wand piston motors Non Food Area 2 High performance lubricant Berulub SIHAF 2 059245 45 to 160 C For all rubber seals like NBR EPDM Viton Inapplicable for Silicon O Ring 3 Synth Assembly Grease Klübersynht UH1 64 2403 054567 30 to 140 C Lower Piston O Ring Do not use with EPDM rubbers 6 PM Service kits The service and extension kit are available in the spare parts catalogue of our...

Page 9: ...alve 1 1 Expansion valve 11 bar Coffee boiler 1 1 1 Gasket kit brewing unit Brewing unit 1 1 1 Level sensor 180 mm Steam boiler 1 1 Milk foamer Milk system 1 1 Non return valve Boiler 2 2 O Ring seal Vacuum valve Vacuum valve 1 1 Pressure switch 1 3 bar Steam boiler 1 1 Relief valve Steam valve block 1 1 Silicon hose 6 0 x 3 0 mm rosa Milk system 1 1 Silicon hose 6 0 x 3 0 mm white Air foam valve ...

Page 10: ...rewing unit 1 1 1 Level sensor 140 mm Steam boiler 1 1 1 Milk foamer Milk system 2 2 Non return valve Boiler 2 2 2 O Ring seal Steam valve block 2 2 2 O Ring seal Brewing valve 2 2 2 O Ring seal Vacuum valve Vacuum valve 1 1 1 Pressure switch 1 5 bar Steam valve block 1 1 1 Relief valve steam Steam valve block 1 1 1 Silicon hose 6 0 x 3 0 mm rosa Milk system 2 2 Silicon hose 6 0 x 3 0 mm white Air...

Reviews: