background image

YNG TAL 14 / ESMT1 D: 09.07.2015 / RN 002.

Thank you for purchasing this shalstone  4 ft 6in bed. Please read the instructions carefully before use  to ensure 
safe and satisfactory operation of this product

The fıttings pack contains 

SMALL ITEMS

which should be 

KEPT AWAY FROM YOUNG 

CHILDREN.

This product is 

HEAVY

it should be assembled as near as possible to the point of use

TAKE CARE 

WHEN LIFTING 

to avoid personal injury and (or) damage to the product.

Please check the pack contents before attempting to assemble this product. A full checklist of components is 
given in this leaflet. If any components are missing, please contact the retailer from whom you bought this 
product.

Pre-assembly preparation 

Please ensure instructions are read in full before attempting to assemble  this product. 

This item is

HEAVY

Shalstone Bedstead Double

Stock numbers 80311502

Necessary 

Tools

This product is product takes approximately 

20 MINUTES

TO 

assemble with

2 PEOPLE

.

Page 1 of 6

Summary of Contents for Shalstone Bedstead Double

Page 1: ... WHEN LIFTING to avoid personal injury and or damage to the product Please check the pack contents before attempting to assemble this product A full checklist of components is given in this leaflet If any components are missing please contact the retailer from whom you bought this product Pre assembly preparation Please ensure instructions are read in full before attempting to assemble this produc...

Page 2: ... 6 1 Headboard x 1 Footboard x 1 L H Side Rail x 1 R H Side Rail x 1 A B C D E Firm Fix Assembly Nut x 8 Threads M8 67 x 8 Spanner M13 x 1 Ends for slats x 72 Wooden Dowels 10 35 mm x 8 1 2 3 4 5 6 6 Fittings and parts checklist Page 2 of 6 ...

Page 3: ...ard as shown B 1 1 Threaded rods to be screwed by hand to headboard and footboard before moving to step 2 1 3 4 2 B B B B B B B 2 4x wooden dowels to be attached to the each side rail by using a rubber mallet as shown 3 4 E E E E Step by step assembly instructions Page 3 of 6 ...

Page 4: ...htly press it against the bolt using one of your fingers as shown in the sketch With your other free hand start turning the nut clockwise using the spanner supplied with the fittings As soon as the nut is fully wound on to the bolt remove your finger but continue winding the nut with the spanner until it is tight Repeat same assembly operation for footboard Page 4 of 6 ...

Page 5: ... slat Push fit the slat into the pre drilled pilot holes Please note that it may require a light tap with a rubber mallet to secure the plastic end caps into the holes Repeat this step with the other 35 slats 7 The assembly is now complete 6 6 Page 5 of 6 ...

Page 6: ...ng abrasive compounds acidic or caustic reagents and any bleaches containing oxidising reagents should be avoided as prolonged use may damage the lacquer surface Wipe up spills immediately If sticky marks occur on the surface they can be removed with a dilute solution of warm soapy water The offending area should be rubbed lightly and then completely dried immediately afterwards before replacing a...

Reviews: