background image

                                                                                                                                                                     

05232022JA 

     

                                             

www.epvscreens.com

                        

   U-00221

 

  

         

 

 

 

 

Step 8: 

Insert the 

rods (r)

 through the sleeves according to their corresponding lengths on each edge of the screen 

as shown below. The short rods (top/bottom) will overlap to secure a firm grasp in the middle areas. 

 
 
 
 
 
 

 

 

 

 

 

 

 

 
 
 
 
 

 

 

 

 

 

 

 

 

How to attach the springs 

Step 9:

 Hook one end of the spring and secure inside the groove of the frame, use the 

spring hook (i)

to attach the 

spring to the hole located on the screen material’s outer edge in the following order. 

 

 

 

 

 

 

 

 

 

Back Side 

Back Side 

Back Side 

c

r.

 (Red tips)

 

r.

 (Black tips)

 

Back 

Side 

Go through the hole 

from bottom to top 

 

h. 

 

i. 

Spring must hook both 

overlapping

 short rods. 

c

c

Summary of Contents for Prime Vision ISF Series

Page 1: ...en Correct usage and maintenance will ensure a long product life In order for the ChromaWhite to maintain its projection qualities and optimum performance please refer to the list below for proper mai...

Page 2: ...tion 2 2 2 2 2 2 b Center Joints D5 top position 2 2 2 2 2 2 c Elbow Joints M4 bottom position 4 4 4 4 4 4 d Elbow Joints D5 top position 4 4 4 4 4 4 g M4x7 Screws 24 24 24 24 24 24 h Spring 66 72 80...

Page 3: ...ntal frame B C and secure with the M4x7 screws g as shown in the illustration below Step 4 Connect the elbow joints c d to the top and bottom sections of the vertical frame Once inserted connect the v...

Page 4: ...fully unroll the screen material on a clean surface from the roller to the other side as shown below The back side of the screen material should be placed upwards Step7 Carefully place the screen on t...

Page 5: ...a firm grasp in the middle areas How to attach the springs Step 9 Hook one end of the spring and secure inside the groove of the frame use the spring hook i to attach the spring to the hole located o...

Page 6: ...21 6 First connect on four corners steps 1 4 make sure all four corners are fixed before proceeding with next spring Continue to attach the remaining springs to the material in steps 5 12 in the follo...

Page 7: ...into a structural wood stud use a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Diagonal Sizes of 150 and below use 4 x wall brackets Di...

Page 8: ...hown below and push down at the center of the top of the frame fig 2 to secure For Technical Support or an EPV Screens contact in your area visit www epvscreens com Model Size X Wall bracket distance...

Reviews: