
EPSON Stylus Color 600 Service Manual
Rev. A
3-14
3.2.5.3 CR Motor Assembly Removal
1. Removing the upper housing. (Refer to section 3.2.1)
2. Rotate “Gear, 67.2” (largest gear at the left-hand side of the printer mechanism) toward the front to
disengage the carriage lock mechanism, and move the carriage assembly to the middle of the
printer.
3. Push “HOLDER, PULLEY, DRIVEN” inward to loosen the timing belt and detach the timing belt
from the drive pulley of CR Motor assembly.
4. Remove 2 screws (No.1) and remove “MOTOR, ASSEMBLY, CR” from the mechanism.
WORK POINT
Be sure that the projections of the motor bracket is inserted to the holes of the frame properly.
REQUIRED ADJUSTMENT
When you replace “MOTOR, ASSEMBLY, CR”, be sure to perform the following adjustment:
1) Bi-D Alignment Adjustment (Refer to Chapter 4 / Section 4.2.2.5.)
COMPRESSION SPRING, 19.6
PULLEY, ASSEMLBLY, DRIVEN
TIMING BELT
HOLDER, PULLEY, DRIVEN
Outside side frame
Inside side frame
Figure 3-12. Driven Pulley Removal
Summary of Contents for Stylus color 600
Page 5: ...REVISION SHEET Revision Issued Data Contents Rev A February 20 1997 First issue ...
Page 134: ...Chapter 6 Maintenance Rev A 6 5 No 3 No 11 GEAR 34 No 1 No 2 10mm 2mm 2mm ...
Page 147: ...Appendix Rev A A 10 Figure A 3 C206PSB Board Component Layout ...
Page 148: ...EPSON Stylus Color 600 Rev A A 11 Figure A 4 C206PSE Board Component Layout ...
Page 149: ...Appendix Rev A A 12 Figure A 5 C206PNL Component Layout ...
Page 151: ...Appendix Rev A A 14 Figure A 7 Stylus Color600 Exploded Diagram 2 ...
Page 152: ...EPSON Stylus Color 600 Rev A A 15 Figure A 8 Stylus Color600 Exploded Diagram 3 ...
Page 154: ...EPSON SEIKO EPSON CORPORATION ...