EPSON AcuLaser C8500
Revision C
Disassembly/Assembly/Adjustment
Disassembly/Assembly Procedures
3-110
3.2.17.3 CONT. CHASSIS ASSY (PL14.1.1) Removal
1.
Remove the TOP COVER ASSY. (See Section 3.2.5.4.)
2.
Remove the RIGHT COVER ASSY. (See Section 3.2.5.11.)
3.
Remove the MSI/REGI HIGH ASSY. (See Section 3.2.8.1.)
4.
Remove the CONTROLLER PWB. (See Section 3.2.17.1.)
5.
Remove the CONTROLLER FAN. (See Section 3.2.17.2.)
6.
Remove the 9 screws (silver, w/collar, 6mm) securing the CONT.
CHASSIS ASSY, and remove the CONT. CHASSIS ASSY.
Figure 3-128. CONT. CHASSIS ASSY Removal
Summary of Contents for AcuLaser C8500
Page 12: ......
Page 21: ...C H A P T E R 1 PRODUCTDESCRIPTIONS ...
Page 78: ...C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 108: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 31 Figure 2 38 Xerographics II ...
Page 110: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 33 Figure 2 39 Development ...
Page 118: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 41 Figure 2 45 Drive ...
Page 120: ...EPSON AcuLaser C8500 Revision C Operating Principles 2 43 Figure 2 46 Electrical ...
Page 153: ...C H A P T E R 3 DISASSEMBLY ASSEMBLY ADJUSTMENT ...
Page 269: ...C H A P T E R 4 DIAGNOSTICS ...
Page 353: ...C H A P T E R 5 TROUBLESHOOTING ...
Page 480: ...C H A P T E R 6 MAINTENANCE ...
Page 503: ...C H A P T E R 7 APPENDIX ...
Page 564: ......
Page 565: ......
Page 566: ......
Page 567: ......
Page 568: ......
Page 569: ......
Page 570: ......