Epsolar EPHC10-EC series Instruction Manual Download Page 3

press the switch to reset the controller immediately. 

While the over load occurs within 20s, press the switch and the load will be 

reconnected after 10s. 

While the over load occurs over 20s, press the switch and the load will be 

reconnected immediately. 

2. After over discharged, the load will be reconnected automatically when 

the battery is charged to 13.1V. (For 12V system only, for 24V, it is 26.2V)

 

After over discharged, the load will be reconnected while you press the 

power switch. Please note the battery voltage needs to be over 12.5V. (For 

12V system only, for 24V, it is 25V. ) 

To correct problem   

 

1.

 

Check wires 

2.

 

Reduce amps if needed 

3.

 

Reset controller 

 

Disconnect battery    + 

 

Reconnect battery   

 

RATINGS (12V or 12/24V auto work) 

EPHC10-EC    170W or 10 A for Solar and Load 

NOTES: For use with solar panels only 

TECHNICAL INFORMATION 

 

Equalization voltage (60 minutes)     

 

14.8 V   

 

Boost voltage (60 minutes)             

 

  14.4 V 

 

Float Voltage                                        13.7V 

 

Low voltage Disconnect                 

 

  11.1 V   

 

Low voltage Reconnect                        13.1 V 

Note: all is for 12V system only, use 2x for 24 V system   

Reviews: