page | 5
NEW CONSTRUCTION BRACKET INSTALLATION
Whether positioning your Impression satellite speakers or the subwoofer ceiling port, the New Construction
Bracket (ES-IM4-BRKT-IC, not included) can simplify the process. These brackets make finish installation easier by
reserving the exact space and size needed for the speaker during the framing stage of home construction. During
the drywall process, the cutout can be precisely made around the bracket flange.
Important:
For help determining the bracket location, see the respective speaker installation instructions below.
To install the new construction bracket:
1.
Locate the area where the speaker will be placed in the ceiling. Keep in mind that the area should be free
from electrical wires, HVAC, and plumbing.
2.
Connect the wings (or edge plate,
if needed) to the bracket.
3.
Position the bracket between two
joists and secure each bracket
wing or edge plate with
two screws, nails, or staples.
ZONE
1
L
R
ZONE
2
L
R
ZONE
3
L
R
ZONE
4
L
R
4.2 (option) - System, driven from 2 zones / 4 channels
Four satellite speakers, high-pass filter ON
Two subwoofers
Hybrid parallel/serial wiring
(Satelite impedance: 6Ω nominal / 4Ω minimum)
(Subwoofer impedence: 9Ω nominal / 8Ω minimum)
Use included
serial wire
connector
Jois
t
Jois
t
Jois
t
Jois
t