4
GB
ON/OFF
3. Hang the control unit onto the 3 mm upper
projecting screw.
Screw the lower part of the housing onto
the cabin wall using the lower threaded
holes. Fig. 4
Operation
The radiator will be switched on by using the
On/Off- switch (1) at the digital-timer.
With the keys (3) and (4) you can select your
favoured time
(4) = up, (3) = down
After loose of time the digital timer of the ra-
diator switches off automatically.
Fig. 4
Upper mounting hole
Lower mounting holes
Fig. 5
(1)
(2)
(3)
(4)
15