![EOS MM-12920-1 Maintenance And Installation Manual Download Page 32](http://html1.mh-extra.com/html/eos/mm-12920-1/mm-12920-1_maintenance-and-installation-manual_2416809032.webp)
2.4 m Alt-Azimuth Telescope Maintenance Manual MM-12920-1
EOS Technologies, Inc. • 3160 East Transcon Way, Suite 180 • Tucson AZ 85706 • USA
12/1/2009
Tel: +1 520 624 6399 • Fax: +1 520 624 1906 • Web:
www.eostech.com
Page 32 of 43
12. Check the telescope balance as described in Section 3.4.
3.2.6 PROCEDURE FOR REMOVING THE SECONDARY MIRROR FROM THE SUPPORT
1. Wear a dust mask and powder-free latex gloves. Remove any jewelry and items from
pockets that may fall onto the mirror surface.
2. If desired, apply a protective coating to the optical surface of the mirror and allow it to dry
according to the manufacturers recommendations. Applying multiple coats may simplify the
removal process.
3. Place the M2 Assembly securely on blocks, leaving enough room to work under the support.
4. Remove the steel wire connected to the three safety pucks (COM-5974).
5. Move the blocks inside the diameter of the M2 Baffle Holder and verify that M2 Assembly is
secure.
6. Note existing marks or mark the orientation of the M2 Mirror on the M2 Attachment Plate.
7. Remove the six M8 SHCS securing each half of the M2 Baffle Holder (COM-10239) to the
M2 Attachment Plate (COM-5188) and carefully remove the baffle holder, see Figure 3.
Figure 3
M2 Assembly with Baffle Holder
8. Remove the three M5 SHCS securing the M2 Attachment Plate to the M2 Mirror (COM-
5905), see Figure 4.
9. Carefully lift the M2 Mirror off of the M2 Attachment Plate and place it in the shipping
container.