background image

POWER STRIP CORD (YELLOW) 

TV VIDEO CORD (GREEN) 

TV POWER CORD (RED) 

EXTRON POWER CORD (ORANGE) 

POWER & DATA POWER CORD (PURPLE) 

ATTACH PROVIDED POWER 
STRIP TO BOTTOM OFWORK 
SURFACE WITH DOUBLE 
SIDED TAPE  

INSTALL PROVIDED CABLE 
GRIPPERS TO BOTTOM OF 
WORK SURFACE WITH 
PROVIDED WOOD SCREWS 

SAMPLE WIRING DIAGRAM 

ACTUAL COMPONENT PLACEMENT VARIES 

DEPENDING ON TABLE SIZE AND LOCATION OF 

POWER SOURCE 

PROVIDED POWER & DATA UNIT 

-UNIT WILL VARY
DEPENDING ON ACTUAL
ORDER

EXTRON AV UNIT 

PLEASE SEE AV EQUIPMENT 

MANUFACTURES INSTRUCTION (INCLUDED) 

FOR DETAILED INSTALLATION STEPS 

STEP 6

AV INSTALLATION 

Summary of Contents for Concurrence VS

Page 1: ...Concurrence VS Table Installation Instructions Rev 0315 ...

Page 2: ...1 ...

Page 3: ...NSIDE THIS TAB AND RESTS ON THE TOP OF COLUMN BEAM MUST REST ON TOP OF COLUMN FOR PROPER FIT USE PHILLIPS HEAD SCREWDRIVER TO INSTALL 2 20 X SCREWS PER COLUMN DO NOT TIGHTEN YET STEP 1 ATTACHING HORIZONTAL BEAMS TO MONITOR WALL ...

Page 4: ...N BEAM MUST REST ON TOP OF COLUMN FOR PROPER FIT USE PHILLIPS HEAD SCREWDRIVER TO INSTALL 2 20 X SCREWS PER COLUMN TIGHTEN ALL SCREWS USE PHILLIPS HEAD SCREWDRIVER TO INSTALL AND TIGHTEN QTY 2 20 X FLAT HEAD SCREWS 2 PLACES STEP 2 ATTACHING HORIZONTAL BEAMS TO PANEL BASE ...

Page 5: ...4 REPEAT PREVIOUS STEPS SO THAT BOTH BEAMS ARE INSTALLED AND TIGHTENED SECURELY NOTE THAT WORK SURFACE NOTCH SLIDES INSIDE WALL EDGES STEP 3 INSTALLING WORKSURFACE ...

Page 6: ...G PRESSURE IN THE DIRECTION OF BOTH ARROWS INSTALL QTY 4 PROVIDED WOOD SCREWS TO ATTACH L BRACKET TO WORK SURFACE NOTE THAT HOLES ARE PRE DRILLED IN WORK SURFACE NOTE THAT THE BACK OF THE L BRACKET IS TO BE TIGHT TO THE BACK OF THE WORK SURFACE STEP 4 SECURING WORK SURFACE ...

Page 7: ...6 ATTACH 90 DEGREE NW BRACE TO WORK SURFACE WITH PROVIDED WOOD SCREWS 6 SCREWS PER BRACE 90 DEGREE NW BRACE INSTALL QTY 4 WOOD SCREWS PROVIDED PER LZYPLATE LZYPLATE STEP 4 CONT SECURING WORK SURFACE ...

Page 8: ...7 ROUTE MONITOR WIRING BEFORE INSTALLING MONITORS SEE INCLUDED MANUFACTURES MONITOR MOUNTING BRACKET ASSEMBLY INSTRUCTION STEP 5 ROUTING MONITOR WIRING ...

Page 9: ...TAPE INSTALL PROVIDED CABLE GRIPPERS TO BOTTOM OF WORK SURFACE WITH PROVIDED WOOD SCREWS SAMPLE WIRING DIAGRAM ACTUAL COMPONENT PLACEMENT VARIES DEPENDING ON TABLE SIZE AND LOCATION OF POWER SOURCE PROVIDED POWER DATA UNIT UNIT WILL VARY DEPENDING ON ACTUAL ORDER EXTRON AV UNIT PLEASE SEE AV EQUIPMENT MANUFACTURES INSTRUCTION INCLUDED FOR DETAILED INSTALLATION STEPS STEP 6 AV INSTALLATION ...

Page 10: ...E THAT POWER CORD DROPS BETWEEN WALL AND RUNS THRU BOTTOM COMPONENTS POWER CAN BE RUN THRU PANEL BASE AS WELL ROUTE TV POWER VIDEO CORDS THRU THE ROUND CUTOUTS IN WALL BACK PANEL STEP 6 CONT AV INSTALLATION ...

Reviews: