Ambition 24”H Topper Screens Installation Instructions – Rev A.
A M B I T I O N 2 4 ” H T O P P E R S C R E E N
I N S T A L L A T I O N G U I D E
S C R E E N S
A M I 0 0 0 8
Page 1: ...Ambition 24 H Topper Screens Installation Instructions Rev A A M B I T I O N 2 4 H T O P P E R S C R E E N I N S T A L L A T I O N G U I D E S C R E E N S A M I 0 0 0 8...
Page 2: ...N S T A L L A T I O N G U I D E 1 P A R T S A N D F A S T E N E R S I N C L U D E D Screen 10 x 3 4 Self Drilling Screws 10 32 x 1 8 Set Screw PNM 1954 Brackets 10 24 Binding Bolt Pair Gasket EM 1919...
Page 3: ...I N S T A L L A T I O N G U I D E 2 T O O L S A N D S U P P L I E S R E Q U I R E D Drill Driver Phillips Bit Hex Bit...
Page 4: ...nd slide the assembly into the slot on the beam top cap If the fit is too snug use soapy water to slide easier Half Inch Thick Materials Center the screen on the top cap front to back and left to righ...
Page 5: ...T I O N G U I D E In cases where multiple screens are next to each other EM 1919 brackets and the 10 32 Set Screws may be included to connect the screens together at the seams F I G U R E 4 3 A S S E...
Page 6: ...Specifications subject to change without notice Rev 08 2020 1 800 815 7251 www enwork com 12900 Christopher Dr Lowell MI 49331...