www.enware.com.au
Call 1300 369 27
3
• All supply lines must be flushed thoroughly to remove debris
prior to the installation of this product, as per AS/NZS
3500.1. Strainers (40 mesh) are recommended if debris is
an ongoing problem.
• A pressure reduction valve may be required to comply
with the recommended maximum supply pressure and/or
balanced pressure requirements.
INSTALLATION
1. Prepare shower breech in wall, taking into account the
wall depth required for the tap.
Minimum 6mm, maximum 15mm from finished wall to the
face of tap body. SEE IMAGE 01
2. After the wall is finished, screw SBA spindle into tap body
in wall. Use the hex provided on the SBA to tighten with a
spanner. Do not over-tighten.
(Max. torque 18Nm) SEE IMAGE 02
Take note of the way the handles turn.
LTC (Anti-clockwise to close) is marked with blue.
RTC (Clockwise to close) is marked with red on the
spindle. SEE IMAGE 06
3. Fit fibre washer [9] onto spindle and screw locknut [8]
onto SBA spindle [10, 11]. Tighten locknut with a spanner.
(Max. torque 30Nm) SEE IMAGE 03
4. Fit flange dome [6] onto spindle. Ensure the O-ring [7] is in
place. SEE IMAGE 04
OPE
N
CLOSED
80
67
15 MAX.
6 MIN.
61
G5/8" (BSP
)
IMAGE 01
MAX 18Nm
IMAGE 02
installation
IMAGE 04
MAX 30Nm
IMAGE 03