www.enware.com.au
Call 1300 369 273
3
INSTALLATION INSTRUCTIONS
1. Place water chiller in desired position and adjust levelling feet so that the water
chiller is stable and sitting level.
Note: This appliance must be placed in a horizontal position. Ensure at least a
50mm gap is left between the back of the unit and any wall for fan ventilation.
2. Remove the front panel of the chiller unit by unscrewing the two fixing screws. Pull
panel forward and slide down to remove the front panel. SEE
IMAGE 1
IMPORTANT - CHILLER MUST BE DISCONNECTED FROM POWER SUPPLY BEFORE
ACCESSING THE INSIDE OF THE CHILLER UNIT (Read CAUTION note on next page).
3. From inside of the chiller unit, connect the 40mm bottle trap (supplied) to the
waste connection located on the underside of the top tray. Connect DN40 DWV
PVC drain pipe to the bottle trap. SEE
IMAGE 2
4. (Optional) Install a carbon filter (
DFS002F
- sold separately) inside the chiller unit.
Cut or disconnect the 1/4” tube that feeds the bubbler (& carafe filler) and install
the carbon filter in the line.
5. Install a non-return isolating valve or a stop tap (not supplied) at the water supply
as required. Flush all foreign matter from the water supply line, then connect water
supply to the 1/2” BSP male inlet fitting located at the rear of unit.
6. Install spout on the carafe filler. (See Carafe Filler Assembly Instructions below.)
7. Turn the water supply on and purge the air from the stainless steel chilling tank by
pressing the push button on the bubbler or lever on the carafe filler. Water may
spit from the outlets during this procedure and care should be taken not to let
water splash on walls and furniture. Placing a hand over the bubbler whilst purging
the air will help prevent splashing. Allow the water to flow for 5 minutes, starting
and stopping it frequently.
8. Check all plumbing for leaks. Check the bottle trap and drain pipe connections for
leaks. Replace the front panel to the chiller unit.
9. Connect power cable to an electrical outlet. (Electrical connection - a flexible 2m
service lead, 3 pin 10 AMP plug supplied to connect the chiller to a 240V 50Hz AC
supply.) Turn power on. The refrigeration unit and the fans should start to activate.
10. Once water is cooled and chiller function is checked, turn off the power and
disconnect the power cable. Open the front panel and check all plumbing for leaks
once again.
11. Replace front panel of the water cooler and secure using screws provided. Connect
power cable and turn power back on. Remove protective film on stainless models.
FRONT
PANEL
FIXING
SCREWS
IMAGE 1
CONNECT
TO 40MM
WASTE
BOTTLE
TRAP
WATER
INLET
IMAGE 2
CARAFE FILLER ASSEMBLY INSTRUCTIONS
1. Align the brass adjusting nut so that it sits crosswise. SEE
IMAGE 3
2. From the tapered end of the handle, start to slide the handle on to the nut, making
sure the adjusting nut stays in the crosswise direction. SEE
IMAGE 4
3. Slide the handle all the way until it clicks into place.
4. Insert spout into the spout hole. Screw the spout all the way in until it comes to a
stop, then wind back to the desired spout position. SEE
IMAGE 5
5. Turn water supply on and check for leaks.
SLIDE HANDLE ON
FROM THIS SIDE
ADJUSTMENT NUT
POSITIONED
CROSS-WISE
IMAGE 3
IMAGE 5
6. Test the handle by pressing it down. If the
handle is too tight or too loose, turn water
supply off, go back to step 1 and adjust the
nut up or down to achieve correct fit. If the
handle is fit too tight, water may not shut
off properly and may constantly run or drip
from the spout.
To loosen, unscrew nut (up). To tighten,
screw the nut in (down). Go back to step 1.
IMAGE 4