For  multi  story  installations.  A  ceiling  firestop  is 

required  at  the  second  floor,  and  any  subsequent 

floors (see Figure 33). The opening should be framed 

to 10” (25.4 cm) x 10” (25.4 cm) inside dimensions, 

in the same manner as shown in Figure 29.

• 

Any  occupied  areas  above  the  first  floor,  including 

closets  and  storage  spaces,  which  the  vertical  vent 

passes  through,  must  be  enclosed.  The  enclosure 

may  be  framed  and  sheetrocked  with  standard 

building  materials.  However  consult  the  appliance 

manufactures  installation  instructions  for  the 

minimum  allowable  clearance  between  the  outside 

of  the  vent  pipe,  and  the  combustible  surfaces  of 

the enclosure. Do not fill any required air spaces with 

insulation.

Figure 33: Multi-Story Vent Pipe Installation.

C

ATHEDRAL

 C

EILING

 I

NSTALLATION

:

1. 

Follow installation steps 1 & 2 from 

I

NITIAL

 I

NSTALLATION

 - V

ERTICAL

 I

NSTALLATION

.

2.

 Using the plumb bob, mark the center line of the venting system on the ceiling and drill a small hole 

through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of 

the Cathedral Ceiling Support Box.

3.

 Remove shingles or other roof coverings as necessary to cut the rectangular hole for the Support Box. 

Cut the hole 1⁄8” larger than the Support Box outline.

4.

 Lower the Support Box through the hole in the roof until the bottom of the Support Box protrudes at 

least 2 inches (5 cm) below the ceiling. Align the Support Box both vertically and horizontally with a 

level as shown in Figure 34. Temporarily tack the Support Box in the place through the inside walls 

and into the roof sheathing.

Figure 34: Cathedral Ceiling Support Box 

Leveling.

Figure 35: Cathedral Ceiling Support 

Box Installation.

5.

 Using tin snips, cut the Support Box from the top corners 

down  to  the  roof  line,  and  fold  the  resulting  flaps  over 

the roof sheathing (Figure 35). Before nailing it in to the 

roof, run a bead of non-hardening mastic around the top 

edges of the Support Box to make a seal between the box 

and  the  roof.  Clean  out  any  combustible  material  from 

Initial Installation

QUALIFIED INSTALLERS ONLY

the  inside  of  the 

Support Box.

6.

 Complete 

the 

cathedral 

ceiling 

installation 

by 

following 

the 

same  procedures 

outlined  in  Steps 

4  through  9  from 

I

NITIAL

  I

NSTALLATION

  - 

V

ERTICAL

 I

NSTALLATION

.

Summary of Contents for EG40 DV LPG

Page 1: ...ur s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department WARNING If the information in this manual is not followed exactly a fire or explosion m...

Page 2: ...to the current CAN CGA B149 installation code Canada or National Fuel Gas Code ANSI Z223 1 2 USA To prevent injury do not allow anyone who is unfamiliar with the stove to operate it To prevent injury...

Page 3: ...eparation For Installation 12 Clearances to Combustibles 12 Planning Your Installation 13 Corner Installations 14 Mobile Home Installation 14 Vent Termination Restrictions 15 Fireplace Horizontal Vent...

Page 4: ...label Is not for use with solid fuels Is approved for bedroom or bed sitting room IN CANADA must be installed with a listed wall thermostat IN USA see current ANSI Z223 1 for installation instruction...

Page 5: ...MENSIONS 25 635 mm 21 533 mm 12 1 2 318 mm 4 5 8 117 mm 29 1 8 740 mm Shipping Weight 256 lbs 116 kg Figure 1 EG40 Exterior Dimensions RATING LABEL LOCATION The rating label is found inside the right...

Page 6: ...attempted repair may result in a fire or explosion D Do not use this appliance if any part has been under water Immediately call a qualified service technician to inspect the appliance and to replace...

Page 7: ...e of medium height If the flames look like this no venturi adjustment is needed If the flames are fairly short and mostly blue the fireplace is getting too much air Therefore the venturies should be c...

Page 8: ...a temporary problem Depending upon the amount of use cleaning should be required no more than two or three times per season To clean the door use a mild glass cleaner and a soft cloth or a glass clea...

Page 9: ...bers and the door has been resealed re light the pilot following the instructions on the lighting label attached to the unit CLEANING PLATED SURFACES It is important to note that fingerprints and othe...

Page 10: ...carbon monoxide may result causing property damage personal injury or loss of life The qualified service agency is responsible for the proper installation of this kit The installation is not proper o...

Page 11: ...ure 12 O ring on valve screw is similar to what is shown in Figure 6 On some units you will need to pay special attention when installing the burner that the venturi adjustment rod is properly install...

Page 12: ...ting a wall or ceiling joist Check stove and flue system clearance requirements Locate the stove where it can be accessed by a gas supply line Locate the stove in a large and open room that is central...

Page 13: ...from the appliance flue outlet to the ceiling the ceiling thickness the vertical rise through the attic or second story and allow for sufficient vent height above the roof line For two story applicat...

Page 14: ...ation must be in accordance with the Manufactured Home Construction and Safety Standard UL 307B Title 24 CFR Part 3280 and or The Standard for Manufactured Home Installations ANSI A225 1 NFPA 501A Hol...

Page 15: ...12 in 30 cm Clearance from permanently closed window to prevent condensation D 24 in 60 cm Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 2 ft 60 c...

Page 16: ...190 cm length of 4 10 cm double walled flex pipe 12 9 16 tech screws 1 5 190 cm length of 65 8 16 8 cm double walled flex pipe 8 11 2 wood screws Please ensure that all components are supplied with t...

Page 17: ...nal slide the 65 8 16 25 cm flex intake liner over the collar secure the flex liner with three 3 sheet metal screws evenly spaced 14 Attach the vent terminal to the outside of the house using four 4 w...

Page 18: ...90 elbow black 950 4DT VS SV4VS Vinyl siding standoff sheild 942 4DT WT SV4RSN 4DWT Wall thimble 953 4DT SC SV4FC 4DSC Storm collar 963 4DT FS SV4BF 4DFSP Fire stop 988 4DT WS B SV4BM 4DWS Wall strap...

Page 19: ...nation of rise and run can be used as long as it lays within the shaded area a total of three 3 90 elbows or six 6 45 elbows can be used In addition to what is shown if a 90 elbow is used in the horiz...

Page 20: ...odscrews Wall Thimble Strap Sheet metal screws Fold strap here 11 4 3 2cm Figure 26 Installing Decorative Wall Thimble Figure 25 Wall Framing Hole for Horizontal Installation Initial Installation QUAL...

Page 21: ...a chase the minimum clearance to combustibles is 2 5 cm Wood screws x4 Cut vinyl siding away to fit standoff Bolt x4 required Nut x4 required Wood screw x4 required Figure 27 Installing Vent Cap with...

Page 22: ...le drilled in Step 2 Frame the hole as shown in Figure 29 4 Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance Vertical Termination Storm Collar Flashing Roofi...

Page 23: ...er the pipe and push it down to the top of the roof flashing as shown in Figure H Dimension H obtained from table below Table 5 Minimum H for Figure 31 Roof Pitch Minimum Height Ft Meters Flat to 7 8...

Page 24: ...ling and roof at this point From the roof locate the drill hole and mark the outline of the Cathedral Ceiling Support Box 3 Remove shingles or other roof coverings as necessary to cut the rectangular...

Page 25: ...nd install the flex liner to the retro adapter Fully line the CLASS A chimney with a minimum 4 10 cm flex liner to the top of the CLASS A chimney Place a bead of high temperature silicone to the Simps...

Page 26: ...ng outlet DO NOT cut or remove the grounding prong from this plug CAUTION Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify...

Page 27: ...om the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 psig 3 45 KPa Alw...

Page 28: ...ly See Figure 31 or 34 for proper ember placement DO NOT pack this ember material as this could create an unsafe condition leave embers loose Carefully remove logs from box Check to ensure there is no...

Page 29: ...ight up watch for ignition to ALL burner ports If a long delay is noted First wait for the appliance to cool down Open the front door of the appliance Check to carefully reposition the embers making s...

Page 30: ...ew check pilot head for damage Check thermocouple voltage at valve It must be greater than 5 mV If low replace thermocouple Air in gas line pilot dies while knob is depressed Bleed line Check gas line...

Page 31: ...Light Bulb Holder EC 032 Wiring Harness Complete 2 pieces EC 037 Body Wiring Harness EC 037A Burner Wiring Harness EC 037B Fan Control Knob EC 040 IEC Power Cord 115V EC 043 4 oz Bag Coal Embers Only...

Page 32: ...Hinge Set of 2 EG40 302 21 Fan Mount EG40 304 22 Pedestal Box Cover EG40 307 23 Burner Control Assembly NG 30 014 23 Burner Control Assembly LP 30 015 24 Front Pan Burner 30 016 25 Rear Burner with Ve...

Page 33: ...33 Parts Diagram Chassis EG 40 Body Chassis July 2004...

Page 34: ...Parts Diagram Gas Tray Door EG40 Gas Tray Door Assemblies July 2004 27 8 20 9 23 2 4 5 10 6 11 16 26 25 24 3 34...

Page 35: ...nty on all the Electrical Components and Gas Components against manufacturing defects Paint is covered against flaking This offer includes parts and labor for 1 year and for parts only thereafter Your...

Page 36: ..._____________________________ MODEL ___________________________________ SERIAL NUMBER ___________________________ DATE OF PURCHASE _____________ dd mm yyyy DATE OF INSTALLATION ___________ dd mm yyyy...

Reviews: