Shenzhen Envicool Technology Co., Ltd.
The customer must not modify the air
conditioner in any way.
3. Installation and Operation
3.1 Mechanical installation
Before the installation of air conditioner, the fitting
surface of cabinet shall be properly opened with
vent and screw hole, where the hole size shall
refer to the appearance size figure as provided by
the manufacturer.
CAUTION!
If the required cutouts are only made in the switch
cabinet just before mounting of the air conditioner,
make sure that swarf is not allowed to enter the
device hood by using a cover sheet, for example.
Side Mounting:
1)
Air conditioner is labeled with sealing strip, as
shown in the figure below:
2) Install the hook on the air conditioner, as
shown in the figure below:
3) Step 1 hang the hook at the bottom of the
cabinet air conditioner onto the rack; Step 2
push on the top of the air conditioner; Step 3
when hearing the sound of buckling closure,
which means the self-locking success, then go
on with the next step.as shown in the figure
below:
4) Remove the mounting screw in the accessory
bag, and fasten the air conditioner on the
cabinet.
5) Choose appropriate drainage pipe for
installation. (see 5.1.1)
Half-embedded Mounting:
1) Take the air conditioner apart
,
as shown in the
picture below
:
2) Install the air conditioner on the cabinet and fix
it with the screw, as shown in the picture
below
:
EIA series air conditioner user manual
6