Envertech-EVT500 Quick Installation Guide 

In addition to what is explained below, 

the safety and installation information 

provided in the installation manual 

must be read and followed. The 

 

technical documentation and the 

interface and management software 

for the product are available at the 

website:     

http://www.envertec.com

 

 

Components comprised in system 

 

Envertech-EVT500: 

EnverBridge:  

Envertech cloud server: 

the microinverter 

monitoring and protecting 

http://www.enverportal.com

 

 
 
 
 
 
 

 

 

AC BUS cable with 3 

 

 

conductors (4 mm

2

); distance 

 

 

AC BUS 

between connectors: 

 

Cable 

 

2.1m/41” 

 

 

 

1.70m/67” 

 

 

 

2.05m/81” 

 

 

 

 

 

AC 

Connection between AC 

 

Extension 

Cable 

(Opttional) 

junction box and   EnverBridge 

with 3 conductors(4 mm2),also 

can be used as grid cable. 

 

 

 

 

AC Trunk 

Insulated cap for AC BUS 

 

Plug Cap 

cable connectors 

 

 

 

 

AC Trunk 

Terminate the unused end of 

 

End Cap 

AC BUS cable 

 

 

 

 

AC Trunk 

Tool for releasing connection 

 

Unlock 

between AC BUS cable and 

 

Tool 

the Microinverter 

 

 

 

 

 

 

Selecting cable type 

The AC BUS cable is installed by simply rolling out the desired length of cable and 

cutting it size. One end is wired directly into the junction box and the head of the 

branch circuit, eliminating the need for a separate AC interconnect cable. The other 

end is seal from the environment using an AC trunk end cap. The type of AC BUS 

cable is decided by the PV modules installation orientation. Envertech suggests select 

cable type as following description: 

Portrait Orientation 

Landscape Orientation 

 

 

 

 

 

Installing Envertech-EVT500 Microinverter System 

 

The installation must be carried out with the equipment 

disconnected from the grid and with the photovoltaic panels 

shaded or isolated. 

 

1.

 

Position AC BUS cable 

 

Make sure no more than 8 Microinverters be connected to each branch of AC BUS. 

 

Run the AC BUS  cable along 

the  frame  structure  provided 

for installing the photovoltaic 

 

modules. 
 

2.

 

Fix Microinverter to photovoltaic module frame 

 

In order to facilitate positioning, it could be useful to mark the approximate centre of 

 

each photovoltaic module on the frame. 

 

Mount all the Microinverter 
 
under the PV module, away 

from rain and sun and with 

 

logo side facing downwards. 

 

3.

 

Ground the Microinverter and PV panels 

 

Microinverter and photovoltaic panels must be connected to an equipment grounding 

conductor in accordance with the legislation in force in the country of installation. 

 

The inverter can be earthed 
 
using the correct clamp 
 
secured to the chassis and an 
 
adequately sized conductor. 

 

4.

 

Fasten AC BUS cables 

 

Fasten the AC BUS cable and 

grounding wire to the frame 

with cable ties. 

 

Note: Be aware to keep the connectors in a position accessible to the AC cable 

coming from the Microinverter. 

5.

 

Connect AC cables 

 

A. 

Remove the temporary cap from AC BUS cable connectors and then connect 

Microinverters; 

 

B. 

Protect any unused connectors by fitting AC trunk plug caps on them to keep 

them watertight. 

 

 

 

6.

 

Terminate the unused end of AC BUS cable 

 

A. 

Remove about 25mm(1.0’’) of the cable sheath from the conductors; 

 

B. 

Check that all connector parts are present, slide nut onto the cable and insert the 

cable end through clamp ring and sealing ring; 

 

C. 

Insert every cable end to the hole with cable clamp of sealing cap tightly to make 

them insulted; 

 

D. 

Screw nut to sealing cap with torque about 2.5Nm. 