Hardware Installation
Introduction
This chapter provides a checklist to verify your shipment, suggestions for the installation site, and
describes how to install the following XSR hardware:
•
NIM cards
•
Connecting cables
•
Optional - CompactFlash card
•
Optional - Redundant power supply(s), passive power chassis and harness
Verifying Your Shipment
Before installing the XSR, first check your shipment to ensure that everything you ordered arrived
safely. Open the shipping box(es) and verify that you received the following equipment:
•
XSR chassis with installed hardware including any optional NIM cards (shipped separately)
•
One country-specific power cable
•
One external power supply and country-specific power cable (optional)
•
One console cable
•
Rack mount assembly
•
Quick Start Guide
Installation Site Suggestions
When determining an installation site for the XSR chassis, follow the guidelines outlined below:
•
For proper cooling, maintain a minimum clearance of 15.2 centimeters (6 inches) behind the
chassis and 5.08 centimeters (2 inches) of clearance on either side of the chassis.
•
If installing the XSR chassis as a free-standing unit on a shelf, ensure that the shelf can support
a minimum weight of approximately 8 1/2 pounds per fully loaded chassis plus the weight of
the connected network cables.
•
For access to the rear of the chassis, allow an area of 48.26 centimeters (19 inches) wide by 61
centimeters (24 inches) deep.
Note:
For instructions on installing a balun and grounding shunt/terminal strip on E1 NIM cards only,
refer to
Appendix A: Specifications
on
page A-1
.
Summary of Contents for X-Pedition XSR-1850
Page 1: ...XSR 1850 Getting Started Guide Version 7 5 X Pedition Security Router 9033838 07 ...
Page 2: ......
Page 12: ...x ...
Page 16: ...xiv ...
Page 20: ...xviii ...