2-Post Rack Mount Installation
Enterasys 7100G-Series Hardware Installation Guide
C-11
Figure C-9
Securing Mid-Bracket to Rail 7.25 Inch Flush Mount or Mid-Mount
Securing the Rail Assembly for a 2-Post Flush Mount Configuration
When securing the rail and mid-bracket assembly in a flush mount configuration:
1.
Align the rail ear circular openings with outer front flange rack post openings and the
mid-bracket ear openings with outer rear flange rack post openings as shown in
2.
Secure each rail assembly with two screws or fasteners appropriate to the rack at both the rail
ear and mid-bracket ear
1
Four screws from extension rack assembly
3
Rail ear square opening
2
Mid-bracket
4
Cage nut (mid-mount configuration only)
Summary of Contents for 7100G Series
Page 2: ......
Page 12: ...x...
Page 20: ...Getting Help xviii About This Guide...
Page 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Page 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Page 62: ...Regulatory Compliance A 4 Specifications...
Page 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...