4-Post Rack Mount Installation
C-6
Optional Rack Mount Rail Kit Installation
Rack Mount Rail with Attached Extension Assembly Installation
Refer to
on page C-6 as you perform the following procedure.
To install the rack mount rail with extension assembly:
1.
Adjust the length of the two assemblies (callout
1
) to agree with the distance between the
outer face of the vertical rack posts. The screws (callout
5
) holding the assembly together may
need to be loosened slightly to allow for the adjustment. Retighten any loosened screws once
the adjustment has been made.
2.
Install the side of the assembly labeled “right front” (callout
2
) on the front (cool air inlet) right
rack post. Secure the assembly to both the front and rear posts, using rack appropriate screws
or fasteners that you supply.
Do not use the middle hole when securing the assembly to the rack post. The middle hole is
used to secure the adapter plate (previously installed on the chassis) to the assembly.
3.
Repeat Step
2
for the assembly labeled “left front”.
Figure C-4
Installing the Rack Mount Rail with Extension Assemblies
Chassis to Rail Assembly Installation
Refer to
on page C-7 as you perform the following procedure.
To install the chassis into the rail assembly:
1
Rack mount rail with extension assembly
5
Rail assembly adjustment screws
2
Right/left front assembly label location
6
Air flow direction
3
Rack front (cool air inlet)
7
Rack specific screws (8)
4
Rack rear (hot air outlet)
Summary of Contents for 7100G Series
Page 2: ......
Page 12: ...x...
Page 20: ...Getting Help xviii About This Guide...
Page 46: ...Completing the Installation Pin Out Descriptions 2 22 Installation...
Page 58: ...Using the OFFLINE RESET Button 3 12 Troubleshooting...
Page 62: ...Regulatory Compliance A 4 Specifications...
Page 84: ...Management of PoE Power to PDs D 4 About PoE Power over Ethernet...