2. 

 

Typical wiring

 

2.

1

 

Wiring Power

 

 

Wiring  the 

Entelica  Meter 

i

s  very  simple. 

The  electrical  wires  that  are  provided 

with  the 

Entelica  Meter 

are  labeled:  NEUTRAL  (White),  PHASE

-

1  (Black), 

PHASE

-

2  (Red)  and  PHASE

-

3  (Blu

e

).    Besides  the  NEUTRAL  wire

,  which

 

is 

connected to the Neutral bar

, each of the “PHASE” wires must be connected to

 

separate 10A

-

20A circuit breakers

 

(

see 

Figure 

3

 

and 

Figure 

4

)

 

2.2

 

Wiring CTs

 

 

To  measure  energy  consumed  per  circuit,  current  transformers  (CTs)  will  be 

used.  

The 

Entelica Meter 

comes with 42 terminals for CT

s connection, of which, 

s

ix  (6)  terminals 

are  located  on  top  of  the  enclosure  and  eighteen  (18)  on  the 

side

 

(

see 

Figure 

2

)

The  top  terminals  are  to  be  used 

for  measuring  energy  of 

each  PHASE;  and  the  terminals  on  the  side  are  for 

measuring  energy  of  each 

circuit.  

Each CT will use 2 terminals; therefore 21 CTs can be connected to this 

product.  

 

 

 

Figure

 

2

 

-

 

42 terminals for CTs connection

  

 

To connect a CT to 

a

 

terminal o

f the Energy 

Meter

, insert the wires

 

of the CT to 

the  “

+

 

and 

-

“terminal

s

 

while  depressing 

the  yellow  tab  of  the  terminal.    Make 

sure that the insulation is stripped from the wire and that the wire is inserted as 

far in as possible.  Next, i

nsert the

 

CT 

to the desired 

power 

line 

that is connected 

to the

 

circuit breaker to measure energy for that

 

particular feed.

 

Summary of Contents for Entelica Meter

Page 1: ...th the circular magnets the enclosure can be easily mounted no mounting screws are required in the existing electrical panel or in an external NEMA 1 box outside of the electrical panel The Entelica Meter can only be installed by a licensed electrician The electrician will determine whether the product can be mounted inside or outside of the existing electrical panel after his assessment Figure1 S...

Page 2: ...ch six 6 terminals are located on top of the enclosure and eighteen 18 on the side see Figure 2 The top terminals are to be used for measuring energy of each PHASE and the terminals on the side are for measuring energy of each circuit Each CT will use 2 terminals therefore 21 CTs can be connected to this product Figure 2 42 terminals for CTs connection To connect a CT to a terminal of the Energy M...

Page 3: ...lectrical panel to install the Entelica Meter or not If not he will install the unit in a NEMA 1 enclosure mounted adjacent to the electrical panel and run all the wires through a conduit from the external enclosure to the internal of the electrical box The installations of the Entelica Meter can be seen in Figures 3 and 4 below ...

Page 4: ...Figure 3 Entelica Meter Energy Gateway Install A inside Panel Terminals Terminals PHASE 1 PHASE 2 PHASE 3 120VAC 215VAC ...

Page 5: ...Figure 4 3050 Install B outside Panel NEMA 1 ENCLOSURE Conduit PHASE 1 PHASE 2 PHASE 3 120VAC 215VAC ...

Page 6: ...Please refer to these photographs of actual installations Entelica Meter Entelica Meter with Ethernet cable attached ...

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ...Example of an Entelica Meter installed outside of the circuit breaker panel End of Examples ...

Reviews: