393829
‐
2
Rev
1:
19.04.2017.
KJK
We
reserve
the
right
to
change
technical
data
without
notice.
http://www.ensy.no
Side 19
2.1
Brackets
and
vibration
gasket
Suspension
bracket
screwed
on
top
of
the
unit
as
shown.
Use
8
pcs
M5
x
16mm,
supplied
with
the
unit.
(Sketch
over
show
AHU
‐
200
KV
SLIM)
Mount
the
wall
bracket
with
vibration
gasket.
Make
sure
that
the
edge
protection
gasket
is
placed
on
the
wall
bracket.
Be
sure
that
the
vibration
gasket
is
intact.
Glue
vibration
gasket
to
the
back
of
the
unit,
see
illustration.
Approx.
50mm
from
the
bottom
of
the
unit.
Lift
the
unit
in
place
and
ensure
that
there
is
no
direct
contact
between
unit
and
building
construction.