ensto Enervent eAir Quick Manual Download Page 4

Follow these steps:

Read the accurate instructions from the installation manual if you are installing a second control panel 
in addition to an excisting one.
1.  Connect the ventilation unit to the wall mounting bracket with the cable.  
 

Connect the sensor to the wall mounting bracket.

2.  Install the wall mounting bracket on the wall mounting box.
3.  Install the battery in the eAir control device and place it in the wall mounting bracket.
4.  Switch on the power of the ventilation unit – the eAir control device starts  
 

automatically. The battery will start charging.

5.  The Ensto logo appears on the display. The wireless connection is established  
 

between the eAir control device and the wall mounting bracket. Wait for the text:  

 

”Welcome to Setup Wizard”

 (it appears in about 2 minutes).

6. The 

Setup Wizard

 is a step-by-step installation program. It is essential that you use it:  

 

the program takes you through all the required settings to initialise the ventilation unit. 

7. Press 

”Next”

 and choose your language.

8.  Follow the instructions of the 

Setup Wizard

.

9.   Only do changes on the menus when needed.
10.  In case the 

Setup Wizard

 is aborted, you can easily return to it on the bottom edge of   

the display: 

» Settings » Settings menu » Setup Wizard

  

IMPORTANT! Specified instructions and schemes are in the separate Instruction Guide.

See the image on the cover 

1. eAir control device

   

2. Wall mounting bracket

   

3. Sensor. Note! Extra equipment.

   

4. Cable

   

5. Battery

Contractor quick guide for installing the eAir panel

Reviews: