SHB120 LAG1155 Full-Size SBC U
ser’s Manual
Hardware Installation
30
Perform Visual and Tactile verification that protective cover is properly seated in the
LGA1155 Socket:
*Hold cover and move gently "side to side" to feel the play within the cover and the
LGA1155 Socket.
Close the socket load plate and engage the load lever (see image below).
Summary of Contents for SHB120
Page 7: ...vi MEMO ...
Page 13: ...SHB120 LAG1155 Full Size SBC User s Manual Jumpers And Connectors 6 2 2 Board Layout ...
Page 39: ...SHB120 LAG1155 Full Size SBC User s Manual Hardware Installation 32 MEMO ...
Page 65: ...SHB120 LAG1155 Full Size SBC User s Manual AMI BIOS Utility 58 MEMO ...
Page 69: ...SHB120 LAG1155 Full Size SBC User s Manual PCI IRQ Routing 62 MEMO ...
Page 91: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 84 ...
Page 93: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 86 Subnet mask ...
Page 97: ...SHB120 LAG1155 Full Size SBC User s Manual iAMT Settings 90 MEMO ...
Page 103: ...SHB120 LAG1155 Full Size SBC User s Manual PICMG v1 3 Interface Definition 96 MEMO ...