5. Testing Verification
After completing the wiring and parameter setting, we should verify if the setting is
correct. This chapter will introduce how to use a single computer to test whether the
converter work well.
The operating system can be Window 7/8/10. The “Hyper Terminal” utility should be
installed on host PC/NB.
The following topics are covered in this chapter:
□
Hyper Terminal for TCP/IP
□
Hyper Terminal for COM Port
□
Data Transmission
5.1 Hyper Terminal for TCP/IP
5.1 .1 Open the Hyper Terminal