background image

V087040-G   October 07

Kohler Co.

NEW ZEALAND

KOHLER NZ Ltd.
133 Diana Drive,
Glenfield,
Auckland.
Ph (09) 980 6800
Fax (09) 980 6899
[email protected]
www.kohler.co.nz

           Then rotate bracket 90deg to 

           engage small pin at bottom 

end of bracket in small hole.

Repeat for all brackets. 

11

           Align hoops with mounting 

           brackets, push down and 

click into position.  Press fit 2 soap 

dishes & 2 top hoops.

12

           Fit top end of Tee into 

           horizontal slot in the tower. 

10

CALL US FOR HELP

AUSTRALIA

KOHLER Co.
Unit 10, 70-99 St. Hilliers Road,
Auburn,
Sydney. NSW 2144.
Ph (02) 9714 3900
Fax (02) 9714 3966
[email protected]
www.kohler.co.nz

        Hold plastic mounting bracket   

        as shown.

9

       Position Tower in corner and 

       engage clips along length ensur-

ing all clips are inside the extrusion.

7

        Holding the bottom fast with 

        foot, secure the top clip using 

a sharp jolt with the palm of your 

hand.  Continue down to the bottom 

of the Tower. 

8

Shower Tower

Spring clip

Wall lining

        Fix clips to wall using screws   

        supplied. Seal screw heads 

with silicone

6

Reviews: