V087040-G October 07
Kohler Co.
NEW ZEALAND
KOHLER NZ Ltd.
133 Diana Drive,
Glenfield,
Auckland.
Ph (09) 980 6800
Fax (09) 980 6899
[email protected]
www.kohler.co.nz
Then rotate bracket 90deg to
engage small pin at bottom
end of bracket in small hole.
Repeat for all brackets.
11
Align hoops with mounting
brackets, push down and
click into position. Press fit 2 soap
dishes & 2 top hoops.
12
Fit top end of Tee into
horizontal slot in the tower.
10
CALL US FOR HELP
AUSTRALIA
KOHLER Co.
Unit 10, 70-99 St. Hilliers Road,
Auburn,
Sydney. NSW 2144.
Ph (02) 9714 3900
Fax (02) 9714 3966
[email protected]
www.kohler.co.nz
Hold plastic mounting bracket
as shown.
9
Position Tower in corner and
engage clips along length ensur-
ing all clips are inside the extrusion.
7
Holding the bottom fast with
foot, secure the top clip using
a sharp jolt with the palm of your
hand. Continue down to the bottom
of the Tower.
8
Shower Tower
Spring clip
Wall lining
Fix clips to wall using screws
supplied. Seal screw heads
with silicone
6