9
3002600 08.17
3.6 VERTICAL INSTALLATION
To mount the IPVB vertically, suspend the power venter
with threaded rod. Once the position of the ran and rods
is finalized, hang 4 pieces of threaded rod through the
mounting holes of the fan as shown in Fig. 5. (On back
side of fan, run threaded rod through both top and bottom
mounting holes.) Once the power venter is leveled, secure
the rod with lock washers and locking hex nuts.
3.7 HORIZONTAL INSTALLATION
To mount the IPVB horizontally, suspend the power venter
with threaded rod or steel hangers. It may be necessary to
cross brace the fan from end to end to prevent side sway.
Ensure the fan is level before permanently securing.
L-Brackets are installed for additional support and stability of
the fan. Neoprene strips (or similar) should be placed on
the brackets to dampen vibration noise. Do not attach them
to the fan itself.
Fig 6
Flanged stack connections
3/8" Threaded rod, lock washers
and locing hex nuts
(A tack weld may be placed on the hex nuts
for permanently fixation)
Fig 7
HANG FAN FROM (4)
TOP MOUNTING HOLES
Summary of Contents for IPVB 300
Page 17: ...17 3002600 08 17 Notes...
Page 18: ...18 3002600 08 17 Notes...
Page 19: ...19 3002600 08 17 Notes...