![Enertech BG950 Installation And Maintenance Instructions Manual Download Page 6](http://html1.mh-extra.com/html/enertech/bg950/bg950_installation-and-maintenance-instructions-manual_2411598006.webp)
Warning
!
7
1. DESCRIPTION
1.2 Warning
- Read the manual before assembling or commissioning.
- The contents of this manual are to be observed by all who work for
any reason on the unit and its appertaining system parts.
- This manual is intended especially for authorised personnel.
- This manual is to be regarded as part of the burner and shall always be
available near the place of installation.
- The burner is only to be installed by qualified personnel
- Check that the burner is suitable for the boiler´s power range.
- The burner is to be installed such that it complies with any local
regulations relating to electrical safety, boilers and fuel distribution.
- Check that the burner is approved for the gas quality intended
used.
- No burner safety systems are to be disengaged.
- The fitter is to ensure that the boiler room is supplied with fresh air
ventilation that is sufficient in accordance with local standards.
- Before servicing, shut off the fuel supply and the power supply to
the burner.
- The outer temperature of the boiler´s components can exceed
60 °C.
- Check that the guide stop is installed before servicing.
- Take great care when servicing. Trap and pinch risks can be
present.
- The boiler´s sound level can exceed 85 dBA during operation. Use
ear protectors when present in the boiler room.
1.2.1 Safety directions
The electrical installation shall be made according to valid regulations
for heavy current and in a professional way, so that the risk of leaking
gas, fire or personal injury is avoided.
If another electrical connection is used than the one recommended by
Enertech, there might be a risk of material damage or personal injury.
Notice should be carefully taken by the installer that no electrical cables
or gas pipes get squeezed or damaged when installing or at service
If the boiler is provided with an opening door, this should be interlocked
with a door switch.
1.2.2 Acceptance inspection
Ensure that everything is delivered and that there is no transport
damage. If there is anything wrong with the delivery, please report it to
the supplier. Any transport damage should be reported to the forwarding
company.
1.2.3 Preparations for installation
Ensure that the size and capacity range of the burner are suitable for
the boiler. Power data on the data plate refer to the minimum and maxi-
mum power of the burner.