background image

Installation

Mounting

1. Mark the locations of the battery mounting brackets.  The brackets

must be placed on wall studs with 16" spacing, or on plywood or similar

mounting material to give appropriate support.  The lag screws for the

brackets should be placed at 44.6" (113.3 cm) above the floor surface.

*/

 REV A

A

©2021 OutBack Power.  All Rights Reserved.

Wiring 

 

44.6" 

(113.3 cm)

78.2" 

(198.5 cm) 

16" (40.6 cm)

Plywood 

(Optional)

Wall Stud

Wall Bracket

Wall Stud

1

Plywood 

(Optional)

Battery Bracket 

Locations

4.1" (10.4 cm)

5.0" (12.7 cm)

6.0" 

(15.2 

cm)

8.0" 

(20.3 

cm)

Wall Stud

Wall Stud

3. Install the bonding wire in battery and inverter.  On the inverter’s negative bus
bar, the bonding wire ring terminal must go over the top of the negative conductor.
4. Install the nut on the negative bus bar.  Tighten to the torque value shown.
5. Install battery positive (+) conductor in battery and inverter.  Tighten to the
torque value shown.
6. Install BMS cable in battery and inverter.  In the
inverter, the BMS port is located at the top of the 
compartment (shown at 

7

).

NOTE

:  Do not install the cable in a different port.

6.0" 

(15.2 

cm)  

CLOSE

CLOSED 
RACEWAY

  IMPORTANT 

Do not install the battery brackets at this time.  Mark the locations 

of the lag screws and drill pilot holes if necessary.

  IMPORTANT 

When installed, the inverter is required to hang 6" (15.2 cm) above the 

top of the battery in order to use the included raceway.  The mounting 

bracket is placed according to this spacing.  If a different spacing or 

configuration is used, new raceway will need to be provided.

  IMPORTANT 

If any AC conduit is to be located in the 6" space between the 

inverter and the battery, install it at this time.

2. Mark the location of the inverter’s wall bracket.  The left-hand holes

for the wall bracket should be located 78.2" (198.5 cm) above the floor

surface.  Drill pilot holes if necessary.

3. Install the inverter’s wall bracket as described in the 

Mojave

Inverter/Charger Quick Start Guide

.

4. Complete the mounting of the inverter (not depicted here)

according to the instructions in the 

Quick Start Guide

.  Install

securing screws in the wiring compartment.

5. Place the battery against the wall.  Install the brackets as described

in the 

Mojave ESS Operator’s Manual

          and the image below.

6. Install the wiring raceway as shown below.  Two screws are

provided to attach it to the surface.  Install into plywood or a reinforced 

mounting surface if available.  If a reinforced surface is not available, 

anchors are provided in the kit for mounting into wall board.

  NOTE:

Install AC and other wiring in an 
order appropriate to the 
installation.  See the 

Quick Start 

Guide

 for more information.

1. Install ground conductor in battery and inverter.  Tighten to the torque
value shown.
2. Install battery negative (–) conductor.  Read the following before tightening.

WARNING:  Shock Hazard

The negative conductor must be 

mechanically bonded to the ground bar.  

This is normally performed within the 

Mojave inverter (between points 

1

 and 

4

).

A bonding wire is supplied for this purpose.  

  IMPORTANT 

Install all DC wiring within the 

raceway.  AC wires may not be 

installed within the raceway.

2

3

5

6

Inverter

Battery

Torque Values

Conductor      In-lb

  Nm

Battery

65 to 75

7.3 to 8.5

+ and  –

Ground

   35

   4.0

Installation is complete.  Install all covers.  Follow the 

commissioning steps in each respective manual.