Enersol Pool Panel Installation Guide
9 |
P a g e
5 - Connect Plumbing (continued)
Remember the feed line goes in the bottom
and return comes out the top on the opposite
side.
HECs can also be used as spacers around small
roof vents or similar obstacles. (Purchased
separately
– see drawing below)
Join end-caps to Headers
b)
Connect the end caps to the remaining
headers. To do this liberally apply cement to
the inside lip end of the end cap, steering
clear of the threading.
FOR MALE END:
• Remove O-ring
• Cut locator tab off
• Apply transitional solvent cement liberally to
both male and female surfaces
• Cement together
FOR FEMALE END:
• Cut a piece of 1.5” pipe to 3” long
• Apply PVC cement liberally to all surfaces
and glue together
Always use Teflon tape on the removable threaded
plug of the end cap to prevent leaking (removable
threaded plug can be removed to allow for
drainage).
Use Teflon tape on all End Caps
c)
Complete the roof installation by connecting
the supply and return water lines: measure
twice cut once! If you are travelling a
substantial distance from the panels to the
pool, consider insulating the underground
pipes.