3 Installation
User Manual
20
3 Installation
This chapter mainly describes installation, including the unpacking and checking, installation
preparation, electrical connection, etc.
3.1 Unpacking and Checking
3.1.1 6kVA(L)/ 10kVA(/B)
Besides 6kVA/10kVA(S) standard model, the package of the UPS (
6
-10kVA) series is carton.
Unpacking UPS and conduct the following items:
Inspect the appearance for shipping damage. If any shipping damage is found, report it to the
carrier immediately.
Check the delivery list to see if the types of accessories are complete and correct. If there is any
discrepancy, contact the distributor immediately.
3.1.2 6kVA/10kVA(S)
The package of 6kVA/10kVA(S) standard model adopts the wooden bracket and carton. The
unpacking procedures are as follow.
Step 1
Check the appearance of package for shipping damage. If any shipping damage is found, report it to
the carrier immediately.
Step 2
Transport device to the installation site.
When using a forklift to move UPS, the end of arm of forklift should be beyond the wooden bracket
to avoid falling.
Step 3
Cut belts and remove them.
Step 4
Remove the package and take out the optional components and user manual. The appearance after
unpacking is as shown in Figure3-1.