Enerlites MPC-50V General Specification Download Page 2

 

 
 
 
 
 

 

(Hot)

(Load)

(Neutral)

Black

Red

White

Grey1

Grey2

 

 

   

 

 

   

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

Wiring Directions 

WARNING: Turn off the power at the circuit breaker before installing 

Refer to the wire diagram of the sensor (see figure 2), and connect the wires of 

ceiling sensors as followed by using the wire nuts provided. 1. Connect the Hot wire 

of main power to the Black wire from the sensor. 2. Connect the Load wire to the 

Red wire from the sensor. 3. Connect the Neutral wire of Load and main power to the

White wire from the sensor. 4. Connect the two Grey wires( 22AWG) to the terminals 

of the momentary switch. You can add a MANUAL SWITCH such as the Momentary

Switch to the sensor by connecting the Grey wires.
(Step 4 is not necessary if you don't want to use the function of MANUAL ON/OFF )

Figure 2

mounting

Mounting

Using an Octagonal Junction Box 

1. Pull the high voltage wires into the J-Box through the conduit knockout.

2. Connect the high voltage wires to the appropriate terminals on the sensor.

3. Loosen the appliance mounting screws attached to the J-Box.

4. Align the sensor in the J-Box so that the mounting screws on the box match

the key holes on  the sensor's rear housing.

5. Push the sensor up into the J-Box and  twist it so that the mounting screws

are seated in the keyhole slots.

6. Tighten the two screws to secure the sensor to the J-Box.

7. Snap the front cover onto the sensor(see Figure 3)

Front Cover

Rear Housing

Wire

Screws

Octagonal box 

Drop Ceiling

Figure 3

Summary of Contents for MPC-50V

Page 1: ...13 4m 8 ft 22 ft 22 ft 13 ft 13 ft 7 ft 7 ft 3 ft 0 3 ft Typical desk top level Coverage Pattern Description The MPC 50V 360 passive infrared PIR occupancy sensors turn lighting systems on and off based on occupancy and ambient light levels The light level feature keeps lights from turning on if the ambient light level is sufficient The sensors can be configured to turn lighting on and hold it on ...

Page 2: ...witch to thesensor by connecting the Grey wires Step 4 is not necessary if you don t want to use the function of MANUAL ON OFF Figure 2 mounting Mounting Using an Octagonal Junction Box 1 Pull the high voltage wires into the J Box through the conduit knockout 2 Connect the high voltage wires to the appropriate terminals on the sensor 3 Loosen the appliance mounting screws attached to the J Box 4 A...

Page 3: ... MAX DIP switch 1 OFF 3 Ensure that the Light Level is at the maximum position see LIGHT LEVEL seconds If not see TROUBLESHOOTING 5 Move about the coverage area The lights should come on When testing and adjustment is complete reset DIP Switches Time Delay and Light Level to the desired settings and replace the cover on the sensor ADJUSTMENT Sensor Test Refer to the Figure 8 above Note There is a ...

Page 4: ...s occupancy is detected The sensor time delay operates as programmed When the load turns OFF due to lack of occupancy detection the load can be turned ON again by occupancy detection or switch activation b Turn the lights OFF manually when it is ON 1 When the load is turned OFF manually as long as the sensor continues to detect occupancy the load stays OFF Selected time after the last occupancy de...

Reviews: