103448-02 - 6/13
131
Figure
number
Page
number Description
Section I - Product Description, Specifications & Dimensional Data
Figure 1A
7
Models ALP080B thru ALP210B (Floor Mounted)
Figure 1B
8
Models ALP080B thru ALP210B (Wall Mounted)
Figure 1C
9
Models ALP285B thru ALP399 (Floor Mounted Only)
Section iii - Pre-installation & Boiler Mounting
Figure 2A
14
Clearances To Combustible and Non-combustible Material, Floor Standing
Figure 2B
14
Clearances To Combustible and Non-combustible Material, Wall Mounted
Figure 2C
15
Wall Mounting Hole Location / Layout
Figure 2D
16
Bottom Mounting Bracket Installation / Boiler Wall Mounting
Figure 2E
16
Access Panel & Gasket Installation
Figure 3
18
Stacking Boiler Attachment Bracket Placement
Section iV - Venting
Figure 4
21
Location of Vent Terminal Relative to Windows, Doors, Grades, Overhangs, Meters and Forced Air
Inlets (Concentric Terminal Shown - Two-Pipe System Vent Terminal to be installed in same location
Two-Pipe System Air Intake Terminal Not Shown)
Figure 5
25
Expansion Loop and Offset
Figure 6
25
Field Installation of CPVC/PVC Two-Pipe Vent System Connector - Floor Mounted Boiler Builds
Figure 7A
27
Near-Boiler Vent/Combustion Air Piping - Floor Mounted Boiler Builds
Figure 7B
27
Field Installation of CPVC Vent Pipe - Wall Mounted Boiler Builds
Figure 8
28
Wall Penetration Clearances For PVC Vent Pipe
Figure 9A
28
Direct Vent - Sidewall Terminations
Figure 9B
29
Direct Vent - Sidewall Terminations (Optional)
Figure 10
29
Rodent Screen Installation
Figure 11
29
Direct Vent - Optional Sidewall Snorkel Terminations
Figure 12
30
Direct Vent - Vertical Terminations
Figure 13
30
Direct Vent - Vertical Terminations w/ Sloped Roof
Figure 14
32
Vent System Field Modification to Install PVC to PP Adapter, M&G/DuraVent
Figure 15
33
Field Installation Procedure to Accept Polypropylene Vent Piping - Wall Mounted Boiler
Figure 16
35
Flexible Vent in Masonry Chimney with Separate Air Intake
Figure 17
37
Field Installation of Two-Pipe Vent System Adapter for Stainless Steel
Figure 18
40
Field Installation of Boiler Concentric Vent Collar
Figure 19
41
Cut-To-Length Extension (Cuttable)
Figure 20
41
Fixed Extension (Non-Cuttable)
Figure 21
41
Cutting Straight Pipe
Figure 22
41
Joining Cuttable Pipe
Figure 23
41
Joining Non-Cuttable Pipe
Figure 24
42
Horizontal Concentric Venting
Figure 25
42
Dimension “L”
Figure 26
43
Cutting Vent Terminal Pipe
Figure 27
43
Completing Horizontal (Wall Terminal Installation)
Figure 28
45
Vertical Concentric Vent Installation
Figure 29
45
Dimension “H”
appendix a - Figures