![Ener-G+ HIB-2000 Operator'S Manual Download Page 5](http://html1.mh-extra.com/html/ener-g-0/hib-2000/hib-2000_operators-manual_2409371005.webp)
INSTALLATION INSTRUCTIONS
4
4. Insert the two top screws provided,leaving a gap of 1/4" (6mm) between the screw
head and the wall.(Fig.5)
5. Hang the unit on the installed screws, while holding it securely in your hands.
WALL MOUNTING
1. The unit must be secured to the wall 24in (600mm) away from the floor and 12 in
(305mm) from adjacent walls (Fig.2). The unit can't be covered or hidden by a door.
2. Drill three holes with a diameter slightly smaller than the one for the plastic pins
provided.
3. Insert the pins.(Fig.3 and Fig.4)
TOOLS REQUIRED (not included)
• Electric drill
• Phillips (cross-head) screwdriver
• Measuring tape
To fix the towel rack (Fig.1)
1.Place both ends of the towel rack into the slots at
the back of unit and align the holes.
2.Screw the towel rack and unit together with four
screws (supplied).
Fig.
2
Fig.1
Fig.3
Fig.4
Minimum
12” (305mm)
Minimum
12” (305mm)
Minimum
24” (600mm)
6” (153mm)
15 3/8” (319mm)
15 3/8” (319mm)
6” (153mm)
Wall
Wall
Floor
• Installation must be performed in accordance with the requirements of the CEC by
authorized personnel only.
Summary of Contents for HIB-2000
Page 12: ...11 SCHEMATIC DRAWING SCH MA...