Enelion Energy Guard Assembly Manual Download Page 6

Energy Guard - Assembly manual

9 - 2021

2.

General information

Enelion Energy Guard (EEG) is a device that monitors
energy consumption the whole building, from a single
household to the largest office parks. Based on the
power ordered from the energy supplier and the current
consumption measured by Energy Guard, it is possible
to obtain information - how much power can be directed
for EV charging. Energy Guard can also be used in
the chain of charger stations (car parks, shopping cen-
ter, fleet parking lots), which allows you to use the full
potential of the current supplied energy. Current mea-
surement is performed with the use of measuring coils,
which simplifies the installation process.

Fig. 1: Enelion Energy Guard

Enelion Energy Guard is compatible with the propri-
etary Enelion Chain communication protocol, enabling
communication with the local network of the charger
stations. Thanks for that it is possible to enable Enelion
DLB function, providing dynamic load balancing. This
allows for more effective use of the connection’s power
for charging vehicles.

Ÿ

INFO

See User manual to learn more. The manual
contains detailed information on the functional-
ity and use of the device.

The Enelion Energy Guard comes with a set of mea-
suring coils. The set of EEG includes three current
transformers, intended for installation on the supplying
power wires to the building, omitting charger stations or
on the main connection supplying the entire facility. For
each phase fall one current transformer.

We can distinguish, depending on the needs:

1. Measuring transformers in Home option, with di-

ameter of the hole: 7 mm and maximum input
current 40 A.

Fig. 2: Measuring coils in Home option

2. Measuring transformers in Business option, with

diameter of the hole: 26 mm and maximum input
current 100 A, 23 mm

×

33 mm and maximum in-

put current 300 A or 36 mm and maximum input
current 500 A .

Fig. 3: Measuring coils in Business option

Ÿ

INFO

Measuring coils with 300A and 500A of maxi-
mum current are in opening coils version. It is
a possibility of individual choice of measuring
coils, according to the customer requirements.

5

General information

Summary of Contents for Energy Guard

Page 1: ...Energy Guard Assembly manual Enelion Sp z o o info enelion com...

Page 2: ...Copyright Enelion Sp z o o The manual may change as the product develops The information provided may not be correct All rights reserved Revision V 1 1 Number of pages 16 Released September 24 2021...

Page 3: ...Recommended power connection 6 3 2 Location selection criteria 6 4 Assembly 8 4 1 Mounting the device 8 4 2 Modification of the electrical switchboard 9 4 3 Controll after commissioning 9 4 4 FAQ 10 5...

Page 4: ...ore installation please make sure that the module packages contain all the elements Up to date version of the operation manual can be accessed at http enelion com help Please note the contents of the...

Page 5: ...dur ing its operation must comply with the legal standards in force in the place of assembly and the operation of the device The manufacturer is not liable for any dam age caused by an electrical inst...

Page 6: ...ad balancing This allows for more effective use of the connection s power for charging vehicles INFO See User manual to learn more The manual contains detailed information on the functional ity and us...

Page 7: ...n of it a wired connection be tween devices using a CAT 5 or CAT 6 Ethernet cable is required 3 2 Location selection criteria This device is designed to be installed inside of the electrical switchboa...

Page 8: ...ar heat sources nor in the loca tions exposed to high humidity It is forbidden to install the device in explosion hazard zone Before installation make sure that the mounting space inside the switchboa...

Page 9: ...of 500 m INFO Pay attention to communication bus termi antion both in Energy Guard and charg ing station Use termination for devices at the beginning and end of the network Termination is done by mov...

Page 10: ...er source in the case that this branch would be disconnected for example by triggering its protection Fig 8 Sample connection of the voltage lines to the selected apparatus in the switchboard 4 2 Modi...

Page 11: ...ources are connected to the electri cal system The measuring coils were installed frontside back The status LED flashes yel low Check the connection of the CAN bus wires The status LED is red Contact...

Page 12: ...y consumption to the charging station thanks to which there is a proportional reduction of the available power for EV charging there is no risk of overloading the home electrical installation and thus...

Page 13: ...current below 6 A per phase 1 4 kW single phase or 4 1 kW three phase charging If there is not enough power the charger goes into standby mode Charging will resume when minimum charging power is avail...

Page 14: ...onal current measurement Yes Measurement point parameters Three or one phase system included correct amount of measuring coils Typical reaction time from switch on to change the charging power 1 5 s M...

Page 15: ...the charging station 3 s of delay Mechanical data Housing Plastic PC ABS mountage on DIN rail IP protection Mountage inside the switchboard Maximum diameter of cables Depends on the measuring coils He...

Page 16: ......

Page 17: ...2021 ENELION Pana Tadeusza 50 80 123 Gdan sk Polska...