Using
special fittings / accessories
56
ESE 406 - 606 (D)HG-GT (ES) Duplex
Status: August 2017
Insulation monitoring with switch off
The insulation monitoring serves to provide electrical safety
of the generator as well as all connected consumers and ca-
ble connections during continuous operation.
The operating personnel must check the function of the
shutoff for every start-up by pressing the test button on the
insulation monitoring (see also Chapter 2.7 Electrical safety
check).
The following requirements must be met for the test:
generator has been started (see 4.4)
Figure 5-2: Insulation monitoring
1.
Unplug the device
2.
The circuit breaker must be in Pos. 1.
3.
Press the test button
(see Figure 5-2-(2))
The lamp
(Figure 5-2-(3))
and the position of the circuit
breaker
(Figure 5-2-(4))
indicates the result:
Lamp
Result
Significance
lights up
red
Circuit breaker jumps
to Pos. 0
Insulation monitoring is
OK
stays off
Circuit breaker stays in
Pos. 1
Insulation monitoring is
defective
stays off
Circuit breaker jumps
to Pos. 0
Lamp defective
Table 5.2: Insulation monitoring plus switching off
Important note
Requirements
Testing the insulation
monitoring:
1
2
3
4
Summary of Contents for ESE 406 HG-GT ES DUPLEX
Page 12: ...General information Safety symbols 12 ESE 406 606 D HG GT ES Duplex Status August 2017 Notes...
Page 53: ...Operation Disposal Status at August 2017 ESE 406 606 D HG GT ES Duplex 53 Notes...
Page 68: ...Troubleshooting 68 ESE 406 606 D HG GT ES Duplex Status August 2017 Notes...
Page 75: ...Written guarantee Status at August 2017 ESE 406 606 D HG GT ES Duplex 75 10 Written guarantee...
Page 76: ...Written guarantee 76 ESE 406 606 D HG GT ES Duplex Status August 2017...
Page 77: ...Written guarantee Status at August 2017 ESE 406 606 D HG GT ES Duplex 77 Notes...